IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

131

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0605 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $46,780 $18,225 Not Implemented
MA0605 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $17,280 $975 Implemented
MA0605 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,515 $0 Implemented
MA0605 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,754 $525 Implemented
WI0518 # 01 Y:2006 01 2006 $39,412 $4,975 Implemented
WI0518 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,585 $11,000 Not Implemented
WI0518 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,873 $0 Implemented
WI0518 # 04 Y:2006 04 2006 INSTALL SET-BACK TIMERS $4,978 $1,400 Not Implemented
WI0518 # 05 Y:2006 05 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,862 $7,000 Not Implemented
WI0518 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,802 $1,630 Not Implemented
WI0518 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,994 $2,560 Implemented
WI0518 # 08 Y:2006 08 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,722 $0 Implemented
WI0518 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,210 $778 Implemented
WI0518 # 10 Y:2006 10 2006 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $883 $0 Not Implemented
IA0387 # 01 Y:2006 01 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,756 $680 Not Implemented
IA0387 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,927 $15,519 Implemented
IA0387 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $0 Not Implemented
IA0387 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $542 $1,540 Not Implemented
IA0387 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,935 $50 Implemented
IA0387 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,664 $500 Implemented
IA0387 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $338 $725 Not Implemented
IA0387 # 08 Y:2006 08 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $405 $1,550 Not Implemented
TA0115 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $6,840 $190 Not Implemented
TA0115 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,445 $210 Not Implemented
TA0115 # 03 Y:2006 03 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,295 $0 Not Implemented