IAC logo
IAC Assessment: WI0518
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0518
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2006
Principal Product printing books
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 327
Plant Area (Sq.Ft.) 240,000
Annual Production 40,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,291 79,608,000 kWh $0.00
Electricity Demand $186,487 22,520 kW-months/year $8.28
Natural Gas $109,048 9,937 MMBtu $10.97
TOTAL ENERGY COSTS $586,826
RECOMMENDED SAVINGS* $79,321 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,211
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.424 IMPROVE SPACE COMFORT CONDITIONING Savings:
$39,412
Cost:
$4,975
- - - - - - $39,412 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$39,412
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$14,585
Cost:
$11,000
- - - - $14,585 1,354 - - -
-
kWh
-
-
kW-months/year
$14,585
1,354
MMBtu
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,873
Cost:
-
- - $5,873 722 - - - - -
-
kWh
$5,873
722
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$4,978
Cost:
$1,400
- - $4,978 489 - - - - -
-
kWh
$4,978
489
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$4,862
Cost:
$7,000
$4,862 126,612 - - - - - - $4,862
126,612
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,802
Cost:
$1,630
$2,330 60,674 $1,472 137 - - - - $2,330
60,674
kWh
$1,472
137
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,994
Cost:
$2,560
$1,214 31,625 $780 90 - - - - $1,214
31,625
kWh
$780
90
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,722
Cost:
-
$1,160 30,213 $562 90 - - - - $1,160
30,213
kWh
$562
90
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,210
Cost:
$778
$833 21,708 $377 48 - - - - $833
21,708
kWh
$377
48
kW-months/year
-
-
MMBtu
-
-
$
10: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$883
Cost:
-
$883 28,199 - - - - - - $883
28,199
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$79,321
Cost:
$29,343
$11,282 299,031 $14,042 1,576 $14,585 1,354 $39,412 - $11,282
299,031
kWh
$14,042
1,576
kW-months/year
$14,585
1,354
MMBtu
$39,412
-
$
TOTAL IMPLEMENTED Savings:
$50,211
Cost:
$8,313
$3,207 83,546 $7,592 950 - - $39,412 - $3,207
83,546
kWh
$7,592
950
kW-months/year
-
-
MMBtu
$39,412
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $