Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0072 # 05 Y:2012 | 05 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,345 | $0 | Not Implemented |
MZ0072 # 11 Y:2012 | 11 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,058 | $0 | Implemented |
MZ0072 # 07 Y:2012 | 07 | 2012 | SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS | $36,070 | $1,160 | Implemented |
MZ0072 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,875 | $1,120 | Implemented |
MZ0072 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $44,200 | $56,140 | Implemented |
MZ0072 # 10 Y:2012 | 10 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $438 | $0 | Implemented |
MZ0072 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $2,639 | $180 | Implemented |
MZ0072 # 13 Y:2012 | 13 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,046 | $0 | Implemented |
MZ0072 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $2,260 | $400 | Implemented |
MZ0072 # 06 Y:2012 | 06 | 2012 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $8,585 | $4,500 | Implemented |
MZ0072 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,745 | $19,300 | Implemented |
MZ0072 # 12 Y:2012 | 12 | 2012 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $22,620 | $0 | Implemented |
MZ0072 # 08 Y:2012 | 08 | 2012 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,583 | $0 | Not Implemented |
OK0629 # 05 Y:2001 | 05 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $190 | $0 | Not Implemented |
OK0629 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,735 | $180 | Implemented |
OK0629 # 04 Y:2001 | 04 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $4,536 | $400 | Implemented |
OK0629 # 01 Y:2001 | 01 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $947 | $308 | Implemented |
OK0629 # 07 Y:2001 | 07 | 2001 | INSTALL OCCUPANCY SENSORS | $392 | $627 | Not Implemented |
OK0629 # 06 Y:2001 | 06 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $495 | $374 | Not Implemented |
OK0629 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $193,540 | $25,975 | Not Implemented |
KU0379 # 05 Y:1992 | 05 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,891 | $1,000 | Not Implemented |
KU0379 # 06 Y:1992 | 06 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $3,760 | $20,620 | Not Implemented |
KU0379 # 04 Y:1992 | 04 | 1992 | AIR CONDITION ONLY SPACE NECESSARY | $6,390 | $34,000 | Not Implemented |
KU0379 # 02 Y:1992 | 02 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,467 | $22,400 | Implemented |
KU0379 # 01 Y:1992 | 01 | 1992 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $11,070 | $61,560 | Not Implemented |