Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
57
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0208 # 03 Y:2002 | 03 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,158 | $100 | Implemented |
UM0208 # 01 Y:2002 | 01 | 2002 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,164 | $650 | Implemented |
UM0208 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,036 | $10,015 | Implemented |
UM0208 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $484 | $150 | Implemented |
ND0355 # 05 Y:2000 | 05 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,602 | $15,700 | Implemented |
ND0355 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,566 | $300 | Implemented |
ND0355 # 03 Y:2000 | 03 | 2000 | INSTALL OCCUPANCY SENSORS | $99 | $300 | Not Implemented |
ND0355 # 02 Y:2000 | 02 | 2000 | DEVELOP A REPAIR/REPLACE POLICY | $3,820 | $8,809 | Not Implemented |
ND0355 # 01 Y:2000 | 01 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,537 | $345 | Implemented |
UM0154 # 06 Y:2000 | 06 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $1,980,000 | $568,714 | Not Implemented |
UM0154 # 01 Y:2000 | 01 | 2000 | DISCONNECT BALLASTS | $2,608 | $880 | Implemented |
UM0154 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $9,360 | $0 | Implemented |
UM0154 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,312 | $25,370 | Not Implemented |
UM0154 # 04 Y:2000 | 04 | 2000 | REDUCE VENTILATION AIR | $18,794 | $0 | Implemented |
UM0154 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $1,400 | Not Implemented |
ND0291 # 06 Y:1997 | 06 | 1997 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $287 | $0 | Implemented |
ND0291 # 07 Y:1997 | 07 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $257 | $96 | Not Implemented |
ND0291 # 08 Y:1997 | 08 | 1997 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $170 | $0 | Implemented |
ND0291 # 09 Y:1997 | 09 | 1997 | USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) | $128 | $100 | Not Implemented |
ND0291 # 10 Y:1997 | 10 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $99 | $100 | Implemented |
ND0291 # 05 Y:1997 | 05 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $306 | $360 | Not Implemented |
ND0291 # 12 Y:1997 | 12 | 1997 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5 | $73 | Not Implemented |
ND0291 # 04 Y:1997 | 04 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $443 | $40 | Not Implemented |
ND0291 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,285 | $348 | Implemented |
ND0291 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,398 | $1,350 | Implemented |