IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0208 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,158 $100 Implemented
UM0208 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,164 $650 Implemented
UM0208 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,036 $10,015 Implemented
UM0208 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $150 Implemented
ND0355 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,602 $15,700 Implemented
ND0355 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $300 Implemented
ND0355 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $99 $300 Not Implemented
ND0355 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $3,820 $8,809 Not Implemented
ND0355 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $345 Implemented
UM0154 # 06 Y:2000 06 2000 ADD ADDITIONAL PRODUCTION SHIFT $1,980,000 $568,714 Not Implemented
UM0154 # 01 Y:2000 01 2000 DISCONNECT BALLASTS $2,608 $880 Implemented
UM0154 # 05 Y:2000 05 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $9,360 $0 Implemented
UM0154 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $7,312 $25,370 Not Implemented
UM0154 # 04 Y:2000 04 2000 REDUCE VENTILATION AIR $18,794 $0 Implemented
UM0154 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $732 $1,400 Not Implemented
ND0291 # 06 Y:1997 06 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $287 $0 Implemented
ND0291 # 07 Y:1997 07 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $257 $96 Not Implemented
ND0291 # 08 Y:1997 08 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $170 $0 Implemented
ND0291 # 09 Y:1997 09 1997 USE ALTERNATIVES FOR ACIDS / ALKALINE (WATER, STEAM, ABRASIVE) $128 $100 Not Implemented
ND0291 # 10 Y:1997 10 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $99 $100 Implemented
ND0291 # 05 Y:1997 05 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $306 $360 Not Implemented
ND0291 # 12 Y:1997 12 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $5 $73 Not Implemented
ND0291 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $443 $40 Not Implemented
ND0291 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,285 $348 Implemented
ND0291 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $1,350 Implemented