IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

95

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ST0010 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,071 $429 Implemented
ST0010 # 05 Y:1984 05 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $689 $745 Not Implemented
ST0010 # 06 Y:1984 06 1984 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,423 $74 Implemented
ST0010 # 08 Y:1984 08 1984 INSTALL AUTOMATIC STACK DAMPER $1,582 $3,625 Not Implemented
ST0010 # 13 Y:1984 13 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $342 $32 Implemented
ST0010 # 01 Y:1984 01 1984 BURN WASTE PAPER FOR HEAT $17,516 $25,000 Not Implemented
ST0010 # 09 Y:1984 09 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $228 $150 Implemented
ST0010 # 07 Y:1984 07 1984 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $843 $1,680 Not Implemented
ST0010 # 12 Y:1984 12 1984 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,900 $25 Not Implemented
ST0010 # 11 Y:1984 11 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $910 $537 Implemented
ST0010 # 04 Y:1984 04 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $930 $0 Implemented
ST0010 # 10 Y:1984 10 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $177 $100 Not Implemented
ST0010 # 02 Y:1984 02 1984 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,173 $0 Implemented
KU0146 # 01 Y:1984 01 1984 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $26,862 $25,000 Not Implemented
KU0146 # 03 Y:1984 03 1984 INSULATE BARE EQUIPMENT $1,774 $389 Not Implemented
KU0146 # 18 Y:1984 18 1984 INSTALL AUTOMATIC STACK DAMPER $1,822 $1,400 Implemented
KU0146 # 22 Y:1984 22 1984 INSTALL TURBULATORS $1,530 $1,750 Implemented
KU0146 # 04 Y:1984 04 1984 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING $540 $600 Not Implemented
KU0146 # 17 Y:1984 17 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $153 $150 Implemented
KU0146 # 15 Y:1984 15 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $215 $0 Implemented
KU0146 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,336 $10,562 Not Implemented
KU0146 # 05 Y:1984 05 1984 IMPROVE LUBRICATION PRACTICES $2,306 $1,500 Not Implemented
KU0146 # 02 Y:1984 02 1984 USE OPTIMUM THICKNESS INSULATION $8,162 $450 Implemented
KU0146 # 14 Y:1984 14 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $109 $0 Not Implemented
KU0146 # 19 Y:1984 19 1984 INSTALL TURBULATORS $1,427 $1,176 Implemented