Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
95
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0010 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,071 | $429 | Implemented |
ST0010 # 05 Y:1984 | 05 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $689 | $745 | Not Implemented |
ST0010 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,423 | $74 | Implemented |
ST0010 # 08 Y:1984 | 08 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,582 | $3,625 | Not Implemented |
ST0010 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $32 | Implemented |
ST0010 # 01 Y:1984 | 01 | 1984 | BURN WASTE PAPER FOR HEAT | $17,516 | $25,000 | Not Implemented |
ST0010 # 09 Y:1984 | 09 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $228 | $150 | Implemented |
ST0010 # 07 Y:1984 | 07 | 1984 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $843 | $1,680 | Not Implemented |
ST0010 # 12 Y:1984 | 12 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,900 | $25 | Not Implemented |
ST0010 # 11 Y:1984 | 11 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $910 | $537 | Implemented |
ST0010 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |
ST0010 # 10 Y:1984 | 10 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $177 | $100 | Not Implemented |
ST0010 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,173 | $0 | Implemented |
KU0146 # 01 Y:1984 | 01 | 1984 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,862 | $25,000 | Not Implemented |
KU0146 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $1,774 | $389 | Not Implemented |
KU0146 # 18 Y:1984 | 18 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,822 | $1,400 | Implemented |
KU0146 # 22 Y:1984 | 22 | 1984 | INSTALL TURBULATORS | $1,530 | $1,750 | Implemented |
KU0146 # 04 Y:1984 | 04 | 1984 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $540 | $600 | Not Implemented |
KU0146 # 17 Y:1984 | 17 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $153 | $150 | Implemented |
KU0146 # 15 Y:1984 | 15 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $215 | $0 | Implemented |
KU0146 # 06 Y:1984 | 06 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,336 | $10,562 | Not Implemented |
KU0146 # 05 Y:1984 | 05 | 1984 | IMPROVE LUBRICATION PRACTICES | $2,306 | $1,500 | Not Implemented |
KU0146 # 02 Y:1984 | 02 | 1984 | USE OPTIMUM THICKNESS INSULATION | $8,162 | $450 | Implemented |
KU0146 # 14 Y:1984 | 14 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $109 | $0 | Not Implemented |
KU0146 # 19 Y:1984 | 19 | 1984 | INSTALL TURBULATORS | $1,427 | $1,176 | Implemented |