Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0272 # 01 Y:1985 | 01 | 1985 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,480 | $10,000 | Not Implemented |
GT0272 # 02 Y:1985 | 02 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,331 | $455 | Implemented |
GT0272 # 03 Y:1985 | 03 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $347 | $250 | Implemented |
AT0020 # 02 Y:1985 | 02 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,608 | $300 | Not Implemented |
KU0173 # 07 Y:1985 | 07 | 1985 | IMPROVE LUBRICATION PRACTICES | $398 | $350 | Implemented |
KU0173 # 06 Y:1985 | 06 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $549 | $1,000 | Not Implemented |
KU0173 # 05 Y:1985 | 05 | 1985 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $777 | $200 | Implemented |
KU0173 # 04 Y:1985 | 04 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $890 | $20 | Implemented |
KU0173 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,053 | $1,000 | Not Implemented |
KU0173 # 02 Y:1985 | 02 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $1,572 | $1,200 | Not Implemented |
KU0173 # 01 Y:1985 | 01 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,042 | $3,793 | Implemented |
KU0173 # 08 Y:1985 | 08 | 1985 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $272 | $0 | Implemented |
KU0173 # 09 Y:1985 | 09 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $152 | $150 | Not Implemented |
AT0020 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,254 | $446 | Not Implemented |
AT0020 # 04 Y:1985 | 04 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $210 | $166 | Not Implemented |
AT0020 # 03 Y:1985 | 03 | 1985 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $6,714 | $7,200 | Not Implemented |
AT0020 # 01 Y:1985 | 01 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $119 | $326 | Not Implemented |
KU0162 # 06 Y:1985 | 06 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,763 | $47 | Not Implemented |
KU0162 # 07 Y:1985 | 07 | 1985 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,074 | $7 | Not Implemented |
KU0162 # 08 Y:1985 | 08 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $395 | $0 | Not Implemented |
KU0162 # 05 Y:1985 | 05 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,210 | $4,973 | Not Implemented |
KU0162 # 04 Y:1985 | 04 | 1985 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,058 | $3,000 | Not Implemented |
KU0162 # 03 Y:1985 | 03 | 1985 | IMPROVE LUBRICATION PRACTICES | $5,315 | $2,000 | Not Implemented |
KU0162 # 02 Y:1985 | 02 | 1985 | INSULATE BARE EQUIPMENT | $3,684 | $782 | Not Implemented |
KU0162 # 01 Y:1985 | 01 | 1985 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,801 | $4,838 | Not Implemented |