Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Univ. of Kansas
Assessment Year 1985
Principal Product PRINTED MAGAZINES
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 0
Annual Production 20,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $151,392 2,380,422 kWh $0.06
Natural Gas $25,689 5,715 MMBtu $4.50
TOTAL ENERGY COSTS $177,081
RECOMMENDED SAVINGS* $24,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,801
Cost:
$4,838
$3,801 59,789 - - - - $3,801
59,789
kWh
-
-
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,684
Cost:
$782
$1,746 113,716 $1,938 104 - - $1,746
113,716
kWh
$1,938
104
MMBtu
-
-
$
03: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$5,315
Cost:
$2,000
$5,315 83,529 - - - - $5,315
83,529
kWh
-
-
MMBtu
-
-
$
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,058
Cost:
$3,000
$2,058 - - - - - $2,058
-
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,210
Cost:
$4,973
$4,210 66,237 - - - - $4,210
66,237
kWh
-
-
MMBtu
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$2,763
Cost:
$47
$261 4,103 $2,502 556 - - $261
4,103
kWh
$2,502
556
MMBtu
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,074
Cost:
$7
$75 1,172 $999 222 - - $75
1,172
kWh
$999
222
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$395
Cost:
-
- - $495 110 $(-100) - -
-
kWh
$495
110
MMBtu
$(-100)
-
$
09: 2.1123 INSTALL AUTOMATIC STACK DAMPER Savings:
$405
Cost:
$700
- - $405 90 - - -
-
kWh
$405
90
MMBtu
-
-
$
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$594
Cost:
$500
- - $594 132 - - -
-
kWh
$594
132
MMBtu
-
-
$
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$391
Cost:
$150
$391 6,155 - - - - $391
6,155
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,690
Cost:
$16,997
$17,857 334,701 $6,933 1,214 $(-100) - $17,857
334,701
kWh
$6,933
1,214
MMBtu
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes