Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0255 # 06 Y:1995 | 06 | 1995 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $1,281 | $3,600 | n/a |
WI0255 # 09 Y:1995 | 09 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $615 | $0 | n/a |
WI0255 # 07 Y:1995 | 07 | 1995 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $808 | $950 | n/a |
WI0255 # 03 Y:1995 | 03 | 1995 | SHUT OFF AIR CONDITIONING IN WINTER HEATING SEASON | $2,897 | $6,500 | n/a |
WI0255 # 08 Y:1995 | 08 | 1995 | USE OPTIMUM THICKNESS INSULATION | $671 | $1,067 | n/a |
WI0255 # 05 Y:1995 | 05 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,060 | $0 | n/a |
WI0255 # 10 Y:1995 | 10 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,100 | $0 | n/a |
WI0255 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,156 | $4,639 | n/a |
WI0255 # 11 Y:1995 | 11 | 1995 | RECOVER AND REUSE WASTE MATERIAL | $1,150 | $0 | n/a |
WI0255 # 02 Y:1995 | 02 | 1995 | INSTALL OCCUPANCY SENSORS | $1,141 | $300 | n/a |
WI0255 # 04 Y:1995 | 04 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,521 | $0 | n/a |
WI0250 # 05 Y:1995 | 05 | 1995 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $5,930 | $20,000 | Not Implemented |
WI0250 # 04 Y:1995 | 04 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $162 | $0 | Implemented |
WI0250 # 03 Y:1995 | 03 | 1995 | INSTALL OCCUPANCY SENSORS | $440 | $300 | Not Implemented |
WI0250 # 02 Y:1995 | 02 | 1995 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,543 | $2,000 | Implemented |
WI0250 # 01 Y:1995 | 01 | 1995 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $3,196 | $0 | Not Implemented |
WI0250 # 06 Y:1995 | 06 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,770 | $0 | Not Implemented |
OK0478 # 10 Y:1995 | 10 | 1995 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $6,080 | $500 | Implemented |
OK0478 # 11 Y:1995 | 11 | 1995 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $4,300 | $0 | Implemented |
OK0478 # 09 Y:1995 | 09 | 1995 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $8,089 | $4,295 | Implemented |
OK0478 # 07 Y:1995 | 07 | 1995 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,143 | $1,000 | Not Implemented |
OK0478 # 03 Y:1995 | 03 | 1995 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,482 | $2,520 | Not Implemented |
OK0478 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,792 | $160 | Not Implemented |
OK0478 # 01 Y:1995 | 01 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $63,653 | $25,000 | Implemented |
OK0478 # 06 Y:1995 | 06 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,382 | $1,650 | Not Implemented |