Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
39
matching recommendationsSIC | 275 | Commercial Printing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0006 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $3,642 | $0 | Implemented |
DL0006 # 02 Y:2007 | 02 | 2007 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $2,178 | $0 | Not Implemented |
DL0006 # 03 Y:2007 | 03 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,925 | $995 | Not Implemented |
OK0750 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,525 | $1,000 | Not Implemented |
OK0750 # 01 Y:2007 | 01 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $6,319 | $1,100 | Not Implemented |
OK0750 # 06 Y:2007 | 06 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,311 | $7,391 | Not Implemented |
OK0750 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,081 | $5,998 | Not Implemented |
OK0750 # 03 Y:2007 | 03 | 2007 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $1,091 | $4,248 | Not Implemented |
OK0750 # 05 Y:2007 | 05 | 2007 | INSTALL SKYLIGHTS | $5,428 | $33,634 | Not Implemented |
OK0750 # 09 Y:2007 | 09 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,287 | $6,522 | Not Implemented |
OK0750 # 10 Y:2007 | 10 | 2007 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $4,150,588 | $195,000 | Not Implemented |
OK0750 # 02 Y:2007 | 02 | 2007 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,776 | $8,988 | Not Implemented |
OK0750 # 04 Y:2007 | 04 | 2007 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $8,272 | $16,000 | Not Implemented |
BD0329 # 01 Y:2007 | 01 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $641 | $300 | Implemented |
BD0329 # 09 Y:2007 | 09 | 2007 | MINIMIZE WATER USAGE | $977 | $2,000 | Not Implemented |
BD0329 # 08 Y:2007 | 08 | 2007 | CHANGE OPERATING CONDITIONS | $3,140 | $0 | Not Implemented |
BD0329 # 07 Y:2007 | 07 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,306 | $2,200 | Implemented |
BD0329 # 06 Y:2007 | 06 | 2007 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,834 | $3,600 | Implemented |
BD0329 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $237 | $225 | Implemented |
BD0329 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $3,724 | $225 | Not Implemented |
BD0329 # 03 Y:2007 | 03 | 2007 | USE SYNTHETIC LUBRICANT | $1,202 | $300 | Implemented |
BD0329 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,042 | $0 | Not Implemented |
DL0002 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $21,414 | $10,000 | Not Implemented |
DL0002 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,771 | $62,783 | Not Implemented |
DL0002 # 03 Y:2007 | 03 | 2007 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $19,418 | $73,950 | Not Implemented |