IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,905

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0281 # 12 Y:2009 12 2009 INSTALL OCCUPANCY SENSORS $241 $516 Implemented
SU0281 # 13 Y:2009 13 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,072 $4,000 Implemented
SF0373 # 01 Y:2009 01 2009 REPAIR AND ELIMINATE STEAM LEAKS $1,103 $0 Implemented
SF0373 # 02 Y:2009 02 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,700 $3,605 Implemented
SF0373 # 03 Y:2009 03 2009 INSTALL OCCUPANCY SENSORS $1,227 $1,320 Implemented
SF0373 # 04 Y:2009 04 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $335 $553 Implemented
SF0373 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $765 $1,569 Not Implemented
SF0373 # 06 Y:2009 06 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $402 $906 Implemented
SF0373 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,543 $12,880 Implemented
SF0373 # 08 Y:2009 08 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $32,866 $534,450 Not Implemented
OR0544 # 01 Y:2009 01 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,100 $0 Not Implemented
OR0544 # 02 Y:2009 02 2009 UPGRADE CONTROLS ON COMPRESSORS $2,800 $400 Not Implemented
OR0544 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $3,000 Not Implemented
OR0544 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,500 $15,100 Not Implemented
OR0544 # 05 Y:2009 05 2009 USE SOLAR HEAT TO MAKE ELECTRICTY $1,000 $8,600 Not Implemented
DL0027 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $8,800 $0 Implemented
DL0027 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,691 $27,814 Not Implemented
DL0027 # 03 Y:2008 03 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,514 $52,000 Implemented
UW0014 # 01 Y:2008 01 2008 USE OPTIMUM THICKNESS INSULATION $118,896 $114,435 Not Implemented
UW0014 # 02 Y:2008 02 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $40,835 $57,573 Implemented
UW0014 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,004 $13,992 Not Implemented
UW0014 # 04 Y:2008 04 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $12,247 $70,905 Not Implemented
UW0014 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,513 $5,640 Not Implemented
UW0014 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,327 $1,500 Not Implemented
UD0781 # 01 Y:2008 01 2008 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $15,217 $4,000 Not Implemented