IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,905

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0150 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $885 $304 Implemented
WI0372 # 08 Y:2000 08 2000 INSTALL TIMERS AND/OR THERMOSTATS $137 $400 Not Implemented
WI0372 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $737 $640 Not Implemented
WI0372 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,632 $0 Not Implemented
WI0372 # 05 Y:2000 05 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,804 $2,000 Not Implemented
WI0372 # 04 Y:2000 04 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,060 $0 Not Implemented
WI0372 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,349 $13,911 Not Implemented
WI0372 # 02 Y:2000 02 2000 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $36,000 $0 Not Implemented
WI0372 # 01 Y:2000 01 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $201,600 $0 Not Implemented
WI0371 # 11 Y:2000 11 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $282 $500 Implemented
WI0371 # 01 Y:2000 01 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $24,407 $25,200 Not Implemented
WI0371 # 02 Y:2000 02 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,743 $0 Implemented
WI0371 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,046 $1,000 Not Implemented
WI0371 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,684 $0 Implemented
WI0371 # 05 Y:2000 05 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $7,221 $0 Not Implemented
WI0371 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $2,725 $7,200 Not Implemented
WI0371 # 07 Y:2000 07 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,030 $6,090 Not Implemented
WI0371 # 08 Y:2000 08 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,686 $3,150 Not Implemented
WI0371 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $602 $740 Not Implemented
WI0371 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $0 Implemented
UD0587 # 01 Y:2000 01 2000 RESCHEDULE BREAKS TO ALLOW FOR CONTINUOUS PRODUCTION $374,400 $0 Implemented
UD0587 # 02 Y:2000 02 2000 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $365,350 $1,000,000 Not Implemented
UD0587 # 03 Y:2000 03 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $195,104 $6,720 Not Implemented
UD0587 # 04 Y:2000 04 2000 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $32,550 $0 Implemented
UD0587 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,175 $39,298 Not Implemented