IAC logo
IAC Assessment: WI0375
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0375
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2000
Principal Product Publication Insert Services
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 450
Plant Area (Sq.Ft.) 310,000
Annual Production 1,000,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,834 3,713,951 kWh $0.04
Electricity Demand $92,312 7,578 kW-months/year $12.18
Electricity Fees $12,401 - $ -
Natural Gas $50,290 13,517 MMBtu $3.72
TOTAL ENERGY COSTS $225,868
RECOMMENDED SAVINGS* $1,000,889 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $907,855
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
01: 4.5130 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$416,000
Cost:
$140,000
- - - - - - - - - - $416,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$416,000
-
$
-
-
$
-
-
$
-
-
$
02: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$280,000
Cost:
$60,000
- - - - - - - - - - - - $280,000 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$280,000
-
$
-
-
$
-
-
$
03: 4.4520 ELIMINATE SHIFT Savings:
$208,000
Cost:
-
- - - - - - - - - - $208,000 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$208,000
-
$
-
-
$
-
-
$
-
-
$
04: 4.6230 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME Savings:
$62,609
Cost:
$2,520
- - - - - - - - - - $62,400 - - - - - $209 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$62,400
-
$
-
-
$
-
-
$
$209
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,591
Cost:
$22,283
$10,850 291,032 $5,741 449 - - - - - - - - - - - - - - $10,850
291,032
kWh
$5,741
449
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,364
Cost:
$675
$4,059 108,734 $2,305 180 - - - - - - - - - - - - - - $4,059
108,734
kWh
$2,305
180
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$4,097
Cost:
$7,825
- - - - - - $5,382 463 $(-302) (-276) $(-682) - - - $(-301) - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,382
463
gal
$(-302)
(-276)
lb
$(-682)
-
$
-
-
$
$(-301)
-
$
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,855
Cost:
$500
- - - - $3,855 1,036 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$3,855
1,036
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
09: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,052
Cost:
$1,084
- - - - $1,052 283 - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
$1,052
283
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$969
Cost:
$740
$570 15,240 $399 31 - - - - - - - - - - - - - - $570
15,240
kWh
$399
31
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
11: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$957
Cost:
$300
- - $957 63 - - - - - - - - - - - - - - -
-
kWh
$957
63
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
-
-
$
-
-
$
12: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$395
Cost:
-
- - - - - - - - - - - - $395 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
$395
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$1,000,889
Cost:
$235,927
$15,479 415,006 $9,402 723 $4,907 1,319 $5,382 463 $(-302) (-276) $685,718 - $280,395 - $(-301) - $209 - $15,479
415,006
kWh
$9,402
723
kW-months/year
$4,907
1,319
MMBtu
$5,382
463
gal
$(-302)
(-276)
lb
$685,718
-
$
$280,395
-
$
$(-301)
-
$
$209
-
$
TOTAL IMPLEMENTED Savings:
$907,855
Cost:
$200,500
- - - - $3,855 1,036 - - - - $624,000 - $280,000 - - - - - -
-
kWh
-
-
kW-months/year
$3,855
1,036
MMBtu
-
-
gal
-
-
lb
$624,000
-
$
$280,000
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Ancillary Material Cost