IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

210

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0372 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $737 $640 Not Implemented
WI0372 # 08 Y:2000 08 2000 INSTALL TIMERS AND/OR THERMOSTATS $137 $400 Not Implemented
WI0371 # 01 Y:2000 01 2000 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $24,407 $25,200 Not Implemented
WI0371 # 02 Y:2000 02 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,743 $0 Implemented
WI0371 # 03 Y:2000 03 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,046 $1,000 Not Implemented
WI0371 # 04 Y:2000 04 2000 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,684 $0 Implemented
WI0371 # 05 Y:2000 05 2000 REPLACE CLOTH RAGS WITH PAPER TOWELS $7,221 $0 Not Implemented
WI0371 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $2,725 $7,200 Not Implemented
WI0371 # 07 Y:2000 07 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,030 $6,090 Not Implemented
WI0371 # 08 Y:2000 08 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,686 $3,150 Not Implemented
WI0371 # 09 Y:2000 09 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $602 $740 Not Implemented
WI0371 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $370 $0 Implemented
WI0371 # 11 Y:2000 11 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $282 $500 Implemented
WI0355 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,454 $1,484 n/a
WI0355 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,359 $7,200 n/a
WI0355 # 03 Y:1999 03 1999 INSTALL EQUIPMENT TO MOVE PRODUCT $1,875 $6,350 n/a
WI0355 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,752 $0 n/a
WI0355 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,807 n/a
WI0355 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $641 $640 n/a
BD0130 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $4,723 $500 Not Implemented
BD0130 # 02 Y:1999 02 1999 USE RADIANT HEATER FOR SPOT HEATING $3,506 $2,000 Implemented
BD0130 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $807 $646 Not Implemented
BD0130 # 04 Y:1999 04 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,466 $2,040 Not Implemented
BD0130 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,416 $1,614 Implemented
BD0130 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $867 $450 Not Implemented