IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0261 # 13 Y:2014 13 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $986 $1,660 Implemented
MI0261 # 14 Y:2014 14 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $988 $80 Implemented
MI0212 # 01 Y:2011 01 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,567 $75,000 Not Implemented
MI0212 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $9,200 Not Implemented
MI0212 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $2,600 Not Implemented
MI0212 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,896 $6,665 Not Implemented
MI0212 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,074 $4,800 Not Implemented
MI0212 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,802 $1,300 Not Implemented
MI0212 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $984 $1,993 Not Implemented
MI0212 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $501 $50 Not Implemented
MI0204 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,841 $46,645 Not Implemented
MI0204 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,475 $1,320 Implemented
MI0204 # 03 Y:2011 03 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,367 $2,550 Implemented
MI0204 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,856 $9,183 Not Implemented
MI0204 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,117 $9,600 Not Implemented
MI0204 # 06 Y:2011 06 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $50 Implemented
MI0204 # 07 Y:2011 07 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,858 $3,943 Not Implemented
MI0204 # 08 Y:2011 08 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,252 $4,571 Not Implemented
MI0141 # 01 Y:2006 01 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $20,786 $36,000 Not Implemented
MI0141 # 02 Y:2006 02 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,232 $200 Not Implemented
MI0141 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $6,036 $0 Not Implemented
MI0141 # 04 Y:2006 04 2006 AIR CONDITION ONLY SPACE NECESSARY $2,681 $160 Not Implemented
MI0141 # 05 Y:2006 05 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,825 $2,460 Not Implemented
UF0336 # 01 Y:2004 01 2004 INSTALL SKYLIGHTS $19,224 $20,117 Not Implemented
UF0336 # 02 Y:2004 02 2004 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $16,196 $39,000 Not Implemented