IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

16

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0587 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,034 $0 Implemented
GT0587 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,400 $14,090 Implemented
GT0587 # 03 Y:1996 03 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $480 $0 Not Implemented
GT0587 # 04 Y:1996 04 1996 RECOVER WASTE HEAT FROM EQUIPMENT $23,230 $31,000 Not Implemented
GT0587 # 05 Y:1996 05 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,340 $7,000 Not Implemented
GT0587 # 06 Y:1996 06 1996 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $7,300 $503 Implemented
GT0183 # 01 Y:1983 01 1983 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,660 $200 Implemented
GT0183 # 02 Y:1983 02 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,680 $11,600 Implemented
GT0183 # 03 Y:1983 03 1983 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,850 $9,000 Implemented
GT0183 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $0 Not Implemented
GT0183 # 05 Y:1983 05 1983 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,100 $5,290 Not Implemented
GT0183 # 06 Y:1983 06 1983 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $580 $360 Implemented
GT0183 # 07 Y:1983 07 1983 INSTALL TIMERS AND/OR THERMOSTATS $2,200 $909 Implemented
GT0111 # 01 Y:1982 01 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $814 $0 Implemented
GT0111 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,092 $597 Implemented
GT0111 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $25 Implemented