IAC logo
IAC Assessment: GT0587
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0587
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1996
Principal Product Flexible Packaging
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 35,000
Annual Production 6,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,673 1,645,662 kWh $0.02
Electricity Demand $53,597 3,334 kW-months/year $16.08
Electricity Fees $8,452 - $ -
Natural Gas $55,211 11,072 MMBtu $4.99
TOTAL ENERGY COSTS $162,733
RECOMMENDED SAVINGS* $49,784 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,734
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$10,034
Cost:
-
- - - - $10,034 - - - - - - - -
-
kWh
-
-
kW-months/year
$10,034
-
$
-
-
MMBtu
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,400
Cost:
$14,090
$2,033 86,460 $3,129 195 $238 - - - - - - - $2,033
86,460
kWh
$3,129
195
kW-months/year
$238
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$480
Cost:
-
- - $451 92 $29 - - - - - - - -
-
kWh
$451
92
kW-months/year
$29
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,230
Cost:
$31,000
- - - - - - $23,230 4,656 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$23,230
4,656
MMBtu
-
-
gal
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,340
Cost:
$7,000
$1,421 60,375 $1,734 103 $185 - - - - - - - $1,421
60,375
kWh
$1,734
103
kW-months/year
$185
-
$
-
-
MMBtu
-
-
gal
-
-
$
06: 3.8121 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES Savings:
$7,300
Cost:
$503
- - - - - - - - $1,300 2,000 $6,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,300
2,000
gal
$6,000
-
$
TOTAL RECOMMENDED Savings:
$49,784
Cost:
$52,593
$3,454 146,835 $5,314 390 $10,486 - $23,230 4,656 $1,300 2,000 $6,000 - $3,454
146,835
kWh
$5,314
390
kW-months/year
$10,486
-
$
$23,230
4,656
MMBtu
$1,300
2,000
gal
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$22,734
Cost:
$14,593
$2,033 86,460 $3,129 195 $10,272 - - - $1,300 2,000 $6,000 - $2,033
86,460
kWh
$3,129
195
kW-months/year
$10,272
-
$
-
-
MMBtu
$1,300
2,000
gal
$6,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Ancillary Material Cost