IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0319 # 09 Y:2025 09 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,027 $0 n/a
IC0319 # 02 Y:2025 02 2025 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,099 $14,469 n/a
IC0319 # 12 Y:2025 12 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,597 $5,347 n/a
IC0319 # 13 Y:2025 13 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $799 $519 n/a
IC0319 # 04 Y:2025 04 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,018 $5,197 n/a
IC0319 # 05 Y:2025 05 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $275 $0 n/a
IC0319 # 06 Y:2025 06 2025 INSTALL OCCUPANCY SENSORS $2,117 $2,486 n/a
IC0319 # 01 Y:2025 01 2025 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,393 $16,567 n/a
IC0319 # 10 Y:2025 10 2025 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,445 $3,414 n/a
IC0319 # 08 Y:2025 08 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,088 $20,716 n/a
IC0319 # 07 Y:2025 07 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $295 $481 n/a
IC0319 # 11 Y:2025 11 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,790 $16,614 n/a
IC0319 # 03 Y:2025 03 2025 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,428 $0 n/a
WM0093 # 05 Y:2016 05 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,192 $2,750 Not Implemented
WM0093 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $5,944 $2,280 Not Implemented
WM0093 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $12,490 Not Implemented
WM0093 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,577 $1,680 Implemented
WM0093 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $593 $1,400 Not Implemented
WM0093 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,507 $0 Not Implemented
BD0478 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,961 $15 Implemented
BD0478 # 07 Y:2016 07 2016 INSTALL OCCUPANCY SENSORS $751 $450 Not Implemented
BD0478 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,111 $575 Not Implemented
BD0478 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,217 $1,000 Implemented
BD0478 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,978 $3,229 Implemented
BD0478 # 08 Y:2016 08 2016 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $13,019 $7,560 Implemented