Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0404 # 01 Y:2001 01 2001 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $198,000 $25,000 Implemented
AM0404 # 02 Y:2001 02 2001 REUSE RAGS UNTIL COMPLETELY SOILED $12,600 $0 Implemented
AM0404 # 03 Y:2001 03 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $15,440 $0 Not Implemented
AM0404 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $765 Implemented
AM0404 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,330 $41,800 Implemented
AM0404 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,800 $2,828 Implemented
AM0404 # 06 Y:2001 06 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,710 $368 Implemented
AM0404 # 07 Y:2001 07 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $250 $0 Implemented
AM0392 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $500 $0 Not Implemented
AM0392 # 03 Y:2001 03 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,450 $0 Not Implemented
AM0392 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,370 $870 Not Implemented
AM0392 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $11,290 $15,750 Not Implemented
AM0392 # 08 Y:2001 08 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $420 $0 Not Implemented
AM0392 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,370 $200 Not Implemented
AM0392 # 05 Y:2001 05 2001 PAY UTILITY BILLS ON TIME $1,230 $0 Not Implemented
AM0392 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $810 $75 Not Implemented
TP0011 # 01 Y:2000 01 2000 OPTIMIZE PLANT POWER FACTOR $15,795 $15,500 Not Implemented
TP0011 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $9,378 $2,709 Not Implemented
TP0011 # 03 Y:2000 03 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $937 $1,725 Not Implemented
TP0011 # 04 Y:2000 04 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,704 $0 Not Implemented
TP0011 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,375 $900 Implemented
TP0011 # 06 Y:2000 06 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $93 $461 Implemented
AM0294 # 05 Y:1997 05 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,770 $8,000 Not Implemented
AM0294 # 06 Y:1997 06 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,720 $75 Not Implemented
AM0294 # 07 Y:1997 07 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,500 $0 Not Implemented