Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
60
matching recommendationsSIC | 2752 | Commercial Printing, Lithographic |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ST0010 # 01 Y:1984 | 01 | 1984 | BURN WASTE PAPER FOR HEAT | $17,516 | $25,000 | Not Implemented |
ST0010 # 07 Y:1984 | 07 | 1984 | ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE | $843 | $1,680 | Not Implemented |
ST0010 # 12 Y:1984 | 12 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,900 | $25 | Not Implemented |
ST0010 # 11 Y:1984 | 11 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $910 | $537 | Implemented |
ST0010 # 10 Y:1984 | 10 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $177 | $100 | Not Implemented |
ST0010 # 09 Y:1984 | 09 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $228 | $150 | Implemented |
ST0010 # 08 Y:1984 | 08 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,582 | $3,625 | Not Implemented |
ST0010 # 06 Y:1984 | 06 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $1,423 | $74 | Implemented |
ST0010 # 05 Y:1984 | 05 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $689 | $745 | Not Implemented |
ST0010 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |
ST0010 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,071 | $429 | Implemented |
ST0010 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,173 | $0 | Implemented |
ST0010 # 13 Y:1984 | 13 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $342 | $32 | Implemented |
KU0146 # 17 Y:1984 | 17 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $153 | $150 | Implemented |
KU0146 # 09 Y:1984 | 09 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $23,806 | $3,000 | Not Implemented |
KU0146 # 21 Y:1984 | 21 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,821 | $1,400 | Implemented |
KU0146 # 22 Y:1984 | 22 | 1984 | INSTALL TURBULATORS | $1,530 | $1,750 | Implemented |
KU0146 # 12 Y:1984 | 12 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $200 | $275 | Implemented |
KU0146 # 20 Y:1984 | 20 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $428 | $0 | Implemented |
KU0146 # 16 Y:1984 | 16 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $4,120 | $0 | Implemented |
KU0146 # 15 Y:1984 | 15 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $215 | $0 | Implemented |
KU0146 # 14 Y:1984 | 14 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $109 | $0 | Not Implemented |
KU0146 # 13 Y:1984 | 13 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $10,168 | $5,000 | Implemented |
KU0146 # 11 Y:1984 | 11 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $636 | $25 | Implemented |
KU0146 # 10 Y:1984 | 10 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $345 | $137 | Implemented |