IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0038 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,673 $4,082 Implemented
SF0038 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $843 $600 Implemented
SF0038 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $147 $141 Implemented
MA0316 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $1,389 $2,700 Not Implemented
MA0316 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,618 $685 Implemented
MA0316 # 03 Y:1994 03 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,905 $629 Not Implemented
MA0316 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $312 Implemented
MA0316 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $1,426 $1,789 Not Implemented
MA0316 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $21,512 $16,194 Not Implemented
MA0316 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,576 $0 Implemented
SF0034 # 10 Y:1994 10 1994 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,726 $1,191 Not Implemented
SF0034 # 09 Y:1994 09 1994 INSULATE BARE EQUIPMENT $5,517 $2,939 Not Implemented
SF0034 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,729 $7,007 Implemented
SF0034 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $6,480 $11,289 Not Implemented
SF0034 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,539 $750 Not Implemented
SF0034 # 05 Y:1994 05 1994 INSTALL SKYLIGHTS $8,677 $28,600 Not Implemented
SF0034 # 04 Y:1994 04 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,567 $17,310 Implemented
SF0034 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,330 $1,862 Implemented
SF0034 # 07 Y:1994 07 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,345 $1,600 Not Implemented
SF0034 # 08 Y:1994 08 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,999 $900 Implemented
MO0127 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $171 $275 Implemented
MO0127 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,393 $8,118 Implemented
MO0127 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,313 $50 Not Implemented
MO0127 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,433 $140 Implemented
MO0127 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,043 $822 Not Implemented