IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
Reset
SIC 2752 Commercial Printing, Lithographic
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0237 # 08 Y:1999 08 1999 INSTALL SYSTEM TO COLLECT SCRAP $47,034 $3,932 Not Implemented
IA0237 # 07 Y:1999 07 1999 DISTILL CONTAMINATED SOLVENTS FOR REUSE $7,704 $10,300 Not Implemented
IA0237 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $247 $466 Not Implemented
IA0237 # 01 Y:1999 01 1999 RECOVER WASTE HEAT FROM EQUIPMENT $6,880 $1,142 Not Implemented
IA0237 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,608 $945 Not Implemented
IA0237 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,447 $264 Not Implemented
IA0237 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,914 $8,729 Not Implemented
IA0237 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $0 Not Implemented
NV0139 # 02 Y:1999 02 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $5,129 $0 Implemented
NV0139 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,592 $2,832 Not Implemented
NV0139 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,871 $4,148 Implemented
NV0139 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,567 $600 Implemented
UD0584 # 02 Y:1999 02 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $998 $1,200 Implemented
UD0584 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $981 $356 Implemented
UD0584 # 01 Y:1999 01 1999 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $28,107 $3,150 Implemented
ME0275 # 01 Y:1999 01 1999 INSTALL AN UNINTERUPTABLE POWER SUPPLY $46,000 $73,198 Not Implemented
ME0275 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,878 $5,249 Not Implemented
ME0275 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,418 $100 Not Implemented
ME0275 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $1,457 $1,191 Not Implemented
ME0275 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,080 $220 Not Implemented
ME0275 # 06 Y:1999 06 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $975 $1,326 Not Implemented
ME0275 # 07 Y:1999 07 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,183 $780 Not Implemented
ME0275 # 08 Y:1999 08 1999 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $594 $60 Not Implemented
ME0275 # 09 Y:1999 09 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $593 $150 Not Implemented
ME0275 # 10 Y:1999 10 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $335 $740 Not Implemented