IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,202

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0109 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $3,107 $5,850 Implemented
UA0109 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $7,609 $4,160 Not Implemented
UA0109 # 04 Y:2013 04 2013 UPGRADE CONTROLS ON COMPRESSORS $3,494 $0 Not Implemented
SF0437 # 01 Y:2013 01 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $911 $0 Implemented
SF0437 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $620 $0 Not Implemented
SF0437 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,792 $6,796 Implemented
SF0437 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $425 $729 Implemented
SF0437 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $354 $1,395 Not Implemented
SF0437 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,497 $14,135 Implemented
SF0437 # 07 Y:2013 07 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,111 $46,338 Not Implemented
SF0437 # 08 Y:2013 08 2013 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $15,796 $43,156 Implemented
SF0437 # 09 Y:2013 09 2013 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,489 $13,500 Implemented
WV0467 # 01 Y:2013 01 2013 UPGRADE CONTROLS ON COMPRESSORS $26,386 $31,000 Not Implemented
WV0467 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,885 $0 Not Implemented
WV0467 # 03 Y:2013 03 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,786 $2,550 Implemented
WV0467 # 04 Y:2013 04 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,526 $21,000 Not Implemented
WV0467 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $9,901 $1,000 Implemented
WV0467 # 06 Y:2013 06 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,844 $500 Implemented
WV0467 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,668 $16,750 Not Implemented
WV0467 # 08 Y:2013 08 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $5,230 $3,625 Not Implemented
WV0467 # 09 Y:2013 09 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,986 $9,400 Not Implemented
WV0467 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,815 $248 Implemented
WV0467 # 11 Y:2013 11 2013 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,059 $571 Implemented
WV0467 # 12 Y:2013 12 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,260 $45 Implemented
WV0467 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $534 $826 Not Implemented