IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,202

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0628 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,372 $4,320 Not Implemented
SD0628 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $1,100 Not Implemented
SD0628 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $67,963 $332,640 Not Implemented
SU0528 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,305 $875 Not Implemented
SU0528 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $189 $115 Not Implemented
SU0528 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,717 $2,594 Not Implemented
SU0528 # 05 Y:2022 05 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,343 $660 Not Implemented
SU0528 # 04 Y:2022 04 2022 RECOVER WASTE HEAT FROM EQUIPMENT $6,434 $414 Not Implemented
SU0528 # 03 Y:2022 03 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,193 $100 Not Implemented
SU0528 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,262 $0 Not Implemented
SU0528 # 01 Y:2022 01 2022 DISCONNECT BALLASTS $276 $0 Not Implemented
SU0528 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $650 $1,804 Not Implemented
SU0518 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $176 $723 Not Implemented
SU0518 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $222 Not Implemented
SU0518 # 05 Y:2022 05 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $132 $84 Not Implemented
SU0518 # 04 Y:2022 04 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,298 $675 Not Implemented
SU0518 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $3,498 $196 Not Implemented
SU0518 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,159 $44 Not Implemented
SU0518 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $2,804 $0 Not Implemented
WM0172 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,525 $2,725 Not Implemented
WM0172 # 08 Y:2021 08 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $990 $1,000 Not Implemented
WM0172 # 07 Y:2021 07 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,078 $0 Not Implemented
WM0172 # 06 Y:2021 06 2021 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,076 $6,500 Not Implemented
WM0172 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,512 $5,221 Not Implemented
WM0172 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,314 $3,500 Not Implemented