IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 2759 Commercial Printing, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0097 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,330 $700 Implemented
IC0097 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,092 $41,838 Implemented
WI0313 # 04 Y:1998 04 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,667 $2,000 Implemented
WI0313 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,208 $2,000 Implemented
WI0313 # 01 Y:1998 01 1998 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,445 $7,155 Implemented
WI0313 # 06 Y:1998 06 1998 $251 $0 Implemented
BD0028 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,733 $500 Implemented
WI0206 # 07 Y:1994 07 1994 INSTALL OCCUPANCY SENSORS $178 $225 Implemented
WI0206 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $219 $324 Implemented
WI0206 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $771 $1,542 Implemented
WI0206 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $596 $700 Implemented
WI0206 # 01 Y:1994 01 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,400 $200 Implemented
WI0080 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,098 $0 Implemented
WI0080 # 07 Y:1990 07 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $520 $1,250 Implemented
WI0080 # 05 Y:1990 05 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,274 $500 Implemented
WI0080 # 04 Y:1990 04 1990 INSTALL STORM WINDOWS AND DOORS $1,672 $2,640 Implemented
WI0080 # 01 Y:1990 01 1990 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $32,758 $0 Implemented
WI0079 # 08 Y:1990 08 1990 INSTALL STORM WINDOWS AND DOORS $96 $270 Implemented
WI0079 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68 $500 Implemented
WI0079 # 04 Y:1990 04 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,128 $5,000 Implemented
WI0079 # 03 Y:1990 03 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,365 $1,000 Implemented
WI0079 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,834 $750 Implemented
WI0022 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $220 $500 Implemented
WI0022 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,715 $0 Implemented
WI0022 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $9,403 $0 Implemented