IAC logo
IAC Assessment: WI0313
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0313
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1998
Principal Product Commercial Printing
NAICS n/a
SIC 2759 - Commercial Printing, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 41,954
Annual Production 240,000 Pounds
Production Hrs. Annual 2,250
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $15,989 371,630 kWh $0.04
Electricity Demand $26,526 2,162 kW-months/year $12.27
Electricity Fees $1,447 - $ -
Natural Gas $8,596 1,692 MMBtu $5.08
TOTAL ENERGY COSTS $54,201
RECOMMENDED SAVINGS* $12,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,571
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7251 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF Savings:
$4,445
Cost:
$7,155
$2,448 53,927 $2,182 168 $(-185) (-64,800) - - $2,448
53,927
kWh
$2,182
168
kW-months/year
$(-185)
(-64,800)
Tgal
-
-
$
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,183
Cost:
$4,200
$766 16,999 $3,417 264 - - - - $766
16,999
kWh
$3,417
264
kW-months/year
-
-
Tgal
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,208
Cost:
$2,000
$638 14,068 $570 44 - - - - $638
14,068
kWh
$570
44
kW-months/year
-
-
Tgal
-
-
$
04: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS Savings:
$1,667
Cost:
$2,000
$653 14,361 $1,014 78 - - - - $653
14,361
kWh
$1,014
78
kW-months/year
-
-
Tgal
-
-
$
05: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$256
Cost:
-
- - - - - - $256 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$256
-
$
06: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$251
Cost:
-
- - - - - - $251 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$251
-
$
TOTAL RECOMMENDED Savings:
$12,010
Cost:
$15,355
$4,505 99,355 $7,183 554 $(-185) (-64,800) $507 - $4,505
99,355
kWh
$7,183
554
kW-months/year
$(-185)
(-64,800)
Tgal
$507
-
$
TOTAL IMPLEMENTED Savings:
$7,571
Cost:
$11,155
$3,739 82,356 $3,766 290 $(-185) (-64,800) $251 - $3,739
82,356
kWh
$3,766
290
kW-months/year
$(-185)
(-64,800)
Tgal
$251
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes