IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

360

matching recommendations
Reset
SIC 276 Manifold Business Forms
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0255 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,910 $1,540 Implemented
MZ0255 # 06 Y:2018 06 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $100 Not Implemented
MZ0255 # 05 Y:2018 05 2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,457 $3,200 Not Implemented
MZ0255 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $47,570 $16,500 Implemented
MZ0255 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $19,908 $25,000 Not Implemented
MZ0255 # 03 Y:2018 03 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,288 $1,000 Implemented
MZ0255 # 08 Y:2018 08 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $938 $225 Implemented
MZ0255 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $1,086 $280 Implemented
WM0100 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,307 $4,000 Not Implemented
WM0100 # 01 Y:2017 01 2017 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $42,285 $81,148 Not Implemented
WM0100 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,055 $7,820 Not Implemented
WM0100 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $454 $1,600 Not Implemented
WM0100 # 05 Y:2017 05 2017 INSTALL OCCUPANCY SENSORS $1,541 $0 Not Implemented
WM0100 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,107 $2,250 Not Implemented
WM0100 # 02 Y:2017 02 2017 USE SYNTHETIC LUBRICANT $9,329 $21,800 Not Implemented
OK0928 # 12 Y:2015 12 2015 OPTIMIZE PLANT POWER FACTOR $2,621 $20,000 Not Implemented
OK0928 # 01 Y:2015 01 2015 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $21,773 $7,320 Implemented
OK0928 # 04 Y:2015 04 2015 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $9,143 $18,884 Not Implemented
OK0928 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,204 $5,149 Implemented
OK0928 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,758 $25,753 Implemented
OK0928 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,832 $38,110 Implemented
OK0928 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,212 $863 Implemented
OK0928 # 02 Y:2015 02 2015 INSTALL SET-BACK TIMERS $2,950 $972 Implemented
OK0928 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $988 $2,440 Not Implemented
OK0928 # 10 Y:2015 10 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,912 $5,775 Not Implemented