Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
35
matching recommendationsSIC | 2761 | Manifold Business Forms |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0136 # 02 Y:1984 | 02 | 1984 | OPTIMIZE PLANT POWER FACTOR | $14,985 | $22,000 | Not Implemented |
KU0136 # 27 Y:1984 | 27 | 1984 | INSULATE BARE EQUIPMENT | $98 | $100 | Not Implemented |
KU0136 # 26 Y:1984 | 26 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $347 | $50 | Not Implemented |
KU0136 # 25 Y:1984 | 25 | 1984 | INSULATE BARE EQUIPMENT | $364 | $75 | Not Implemented |
KU0136 # 24 Y:1984 | 24 | 1984 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $391 | $97 | Not Implemented |
KU0136 # 23 Y:1984 | 23 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $795 | $0 | Implemented |
KU0136 # 22 Y:1984 | 22 | 1984 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,867 | $2,640 | Not Implemented |
KU0136 # 21 Y:1984 | 21 | 1984 | IMPROVE LUBRICATION PRACTICES | $2,590 | $2,550 | Implemented |
KU0136 # 20 Y:1984 | 20 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $219 | $400 | Implemented |
KU0136 # 19 Y:1984 | 19 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $387 | $120 | Implemented |
KU0136 # 18 Y:1984 | 18 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $589 | $550 | Implemented |
KU0136 # 17 Y:1984 | 17 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $757 | $25 | Not Implemented |
KU0136 # 16 Y:1984 | 16 | 1984 | RECOVER WASTE HEAT FROM EQUIPMENT | $699 | $350 | Implemented |
KU0136 # 14 Y:1984 | 14 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,003 | $215 | Implemented |
KU0136 # 01 Y:1984 | 01 | 1984 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $22,674 | $18,773 | Not Implemented |
KU0136 # 03 Y:1984 | 03 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,614 | $6,500 | Not Implemented |
KU0136 # 04 Y:1984 | 04 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $14,206 | $69 | Not Implemented |
KU0136 # 05 Y:1984 | 05 | 1984 | INSTALL TIMERS AND/OR THERMOSTATS | $4,034 | $342 | Not Implemented |
KU0136 # 06 Y:1984 | 06 | 1984 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,779 | $0 | Not Implemented |
KU0136 # 07 Y:1984 | 07 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,567 | $176 | Implemented |
KU0136 # 08 Y:1984 | 08 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,972 | $0 | Not Implemented |
KU0136 # 09 Y:1984 | 09 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,693 | $0 | Not Implemented |
KU0136 # 10 Y:1984 | 10 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $2,814 | $1,350 | Not Implemented |
KU0136 # 12 Y:1984 | 12 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $301 | $0 | Not Implemented |
KU0136 # 13 Y:1984 | 13 | 1984 | INSTALL TURBULATORS | $357 | $600 | Not Implemented |