IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0206 # 04 Y:2002 04 2002 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $10,650 $26,000 Not Implemented
UM0206 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,767 $525 Not Implemented
NC0228 # 01 Y:2002 01 2002 $296,000 $75,000 n/a
NC0228 # 02 Y:2002 02 2002 USE COMPRESSOR AIR FILTERS $41,667 $10,600 n/a
NC0228 # 03 Y:2002 03 2002 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $173,756 $88,000 n/a
NC0228 # 04 Y:2002 04 2002 REDESIGN PROCESS $74,974 $100,000 n/a
NC0228 # 05 Y:2002 05 2002 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $12,426 $39,808 n/a
LE0126 # 01 Y:2002 01 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $6,102 $390 Not Implemented
LE0126 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,467 $0 Not Implemented
LE0126 # 03 Y:2002 03 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,515 $4,320 Implemented
LE0126 # 04 Y:2002 04 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,573 $2,500 Not Implemented
LE0126 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,916 $0 Not Implemented
LE0126 # 06 Y:2002 06 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,511 $500 Not Implemented
LE0126 # 07 Y:2002 07 2002 IMPROVE LUBRICATION PRACTICES $1,283 $200 Implemented
LE0126 # 08 Y:2002 08 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $653 $0 Not Implemented
SF0228 # 01 Y:2002 01 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $10,037 $0 Not Implemented
SF0228 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,528 $8,550 Not Implemented
SF0228 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,476 $6,382 Implemented
SF0228 # 04 Y:2002 04 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $122,694 $120,000 n/a
SF0228 # 05 Y:2002 05 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $565 $480 Not Implemented
SF0228 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,326 $23,370 Implemented
SF0228 # 07 Y:2002 07 2002 REDUCE FLUID FLOW RATES $35,747 $56,700 n/a
SF0228 # 08 Y:2002 08 2002 REDUCE FLUID FLOW RATES $6,808 $10,340 Not Implemented
SF0228 # 09 Y:2002 09 2002 REDUCE FLUID FLOW RATES $2,958 $5,070 Not Implemented
SF0228 # 10 Y:2002 10 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $89,821 $24,680 Not Implemented