IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,649

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0277 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $104,870 $6,974 Not Implemented
IC0277 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $1,974 $5,963 Implemented
IC0277 # 09 Y:2023 09 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $7,769 $36,842 Not Implemented
IC0277 # 10 Y:2023 10 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $391,650 $2,055,740 Not Implemented
LE0544 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,946 $100 Not Implemented
LE0544 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,153 $11,000 Not Implemented
LE0544 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $2,400 Not Implemented
LE0544 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,184 $4,100 Implemented
LE0544 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,260 $9,128 Not Implemented
LE0544 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $986 $2,000 Not Implemented
LE0544 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $25,000 $120,000 Not Implemented
SD0629 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $974 $1,320 Not Implemented
SD0629 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $64,030 $201,231 Not Implemented
SD0629 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,538 $10,551 Not Implemented
SD0629 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $888 $1,680 Not Implemented
SD0629 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,948 $100 Not Implemented
SD0626 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,888 $228,599 Not Implemented
SD0626 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,022 $3,456 Not Implemented
SD0626 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,114 $4,352 Not Implemented
SD0626 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,642 $5,868 Not Implemented
SD0626 # 05 Y:2023 05 2023 MODIFY STARTUP/SHUTDOWN TIMES $90,974 $2,500 Not Implemented
SD0626 # 06 Y:2023 06 2023 MODIFY STARTUP/SHUTDOWN TIMES $87,191 $2,500 Not Implemented
SD0625 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $100,326 $408,646 Not Implemented
SD0625 # 02 Y:2023 02 2023 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $868 $4,212 Not Implemented
SD0625 # 03 Y:2023 03 2023 UPGRADE CONTROLS ON COMPRESSORS $348 $1,355 Not Implemented