IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0635 # 05 Y:1998 05 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $8,180 $0 Not Implemented
NC0143 # 01 Y:1998 01 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,467 $700 Implemented
NC0143 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $50,294 $280,937 Not Implemented
NC0143 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $21,615 $25,600 Not Implemented
NC0143 # 04 Y:1998 04 1998 REDUCE FLUID FLOW RATES $2,040 $2,500 Not Implemented
NC0143 # 05 Y:1998 05 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $15,191 $30,000 Not Implemented
NC0143 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $45,561 $55,000 Not Implemented
UD0550 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,950 $139,962 Not Implemented
UD0550 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,061 $1,031 Implemented
UD0550 # 03 Y:1998 03 1998 PURCHASE EQUIPMENT INSTEAD OF LEASING $26,700 $40,000 Implemented
IA0193 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,856 $4,248 Implemented
IA0193 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,240 $9,348 Implemented
IA0193 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $3,418 $399 Not Implemented
IA0193 # 04 Y:1998 04 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,458 $1,000 Implemented
IA0193 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $587 $1,110 Not Implemented
IA0193 # 06 Y:1998 06 1998 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $63,788 $9,315 Implemented
IA0193 # 07 Y:1998 07 1998 INSTALL AUTOMATIC PACKING EQUIPMENT $49,067 $190,000 Not Implemented
IA0193 # 08 Y:1998 08 1998 RECOVER AND REUSE WASTE MATERIAL $27,390 $10,000 Not Implemented
NC0133 # 01 Y:1998 01 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,797 $7,696 Implemented
NC0133 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,905 $1,400 Implemented
NC0133 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,181 $27,560 Not Implemented
NC0133 # 04 Y:1998 04 1998 RECOVER AND REUSE COOLING WATER $97,026 $2,000 Implemented
NC0133 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $18,252 $35,000 Not Implemented
NC0133 # 06 Y:1998 06 1998 ADD ADDITIONAL PRODUCTION SHIFT $500,800 $0 Implemented
AS0226 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,695 $6,794 Not Implemented