IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,673

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0006 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,245 $2,027 Not Implemented
NC0006 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,061 $120 Implemented
NC0006 # 07 Y:1993 07 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,538 $6,000 Not Implemented
UD0407 # 01 Y:1993 01 1993 INCREASE ELECTRICAL CONDUCTOR SIZE TO REDUCE DISTRIBUTION LOSSES $2,303 $6,000 Implemented
UD0407 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,300 $1,000 Implemented
UD0407 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,563 $500 Implemented
UD0407 # 04 Y:1993 04 1993 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,346 $1,500 Implemented
ND0157 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,365 $2,297 Implemented
ND0157 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $368 $864 Not Implemented
ND0157 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $657 $600 Not Implemented
ND0157 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $352 $300 Implemented
ND0157 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $98 $101 Not Implemented
ND0157 # 06 Y:1993 06 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $880 $125 Implemented
ND0157 # 07 Y:1993 07 1993 INSULATE BARE EQUIPMENT $427 $2,355 Not Implemented
ND0158 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,683 $3,575 n/a
ND0158 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $46,659 $5,000 n/a
ND0158 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $240 n/a
ND0158 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,058 $849 n/a
ND0158 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,142 $1,525 n/a
ND0158 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $459 n/a
ND0158 # 07 Y:1993 07 1993 PAY UTILITY BILLS ON TIME $25,013 $0 n/a
UD0401 # 01 Y:1993 01 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,367 $0 Not Implemented
UD0401 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,994 $300 Implemented
UD0401 # 03 Y:1993 03 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $3,714 $10,139 Implemented
UD0401 # 04 Y:1993 04 1993 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,173 $18,000 Not Implemented