IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,577

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0215 # 04 Y:1987 04 1987 RECOVER WASTE HEAT FROM EQUIPMENT $265 $300 Implemented
OK0208 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $97 Implemented
OK0208 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $402 $705 Implemented
OK0208 # 03 Y:1986 03 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,115 $20 Implemented
OK0208 # 04 Y:1986 04 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $207 $78 Implemented
OK0209 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $0 Implemented
OK0209 # 02 Y:1986 02 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,949 $500 Implemented
OK0209 # 03 Y:1986 03 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $22,378 $14,090 Implemented
ST0071 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,364 $537 Implemented
ST0071 # 02 Y:1986 02 1986 INSTALL TIMERS AND/OR THERMOSTATS $9,159 $1,000 Implemented
ST0071 # 03 Y:1986 03 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $108 $0 Implemented
ST0071 # 04 Y:1986 04 1986 REPAIR AND ELIMINATE STEAM LEAKS $5,948 $500 Implemented
ST0071 # 05 Y:1986 05 1986 RECOVER MECHANICAL ENERGY $91,733 $135,000 Not Implemented
UD0207 # 01 Y:1986 01 1986 COMBINE UTILITY METERS $612 $1,000 Not Implemented
UD0207 # 02 Y:1986 02 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,860 $485 Implemented
UD0207 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $295 $240 Implemented
GT0291 # 01 Y:1986 01 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,434 $500 Implemented
GT0291 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $142 $63 Implemented
GT0291 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $528 $600 Implemented
UD0199 # 01 Y:1986 01 1986 USE MINIMUM STEAM OPERATING PRESSURE $7,787 $20,000 Implemented
UD0199 # 02 Y:1986 02 1986 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,568 $2,100 Implemented
UD0199 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,090 $600 Implemented
UD0199 # 04 Y:1986 04 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,052 $300 Implemented
UD0199 # 05 Y:1986 05 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,004 $0 Not Implemented
UD0199 # 06 Y:1986 06 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,044 $0 Implemented