IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,524

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0186 # 08 Y:1986 08 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $396 $385 Implemented
KU0186 # 09 Y:1986 09 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $215 $400 Not Implemented
KU0186 # 10 Y:1986 10 1986 USE OPTIMUM TEMPERATURE $205 $0 Implemented
KU0186 # 11 Y:1986 11 1986 INSULATE BARE EQUIPMENT $187 $172 Implemented
KU0186 # 12 Y:1986 12 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $177 $30 Implemented
UD0186 # 01 Y:1986 01 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,459 $0 Implemented
UD0186 # 02 Y:1986 02 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,586 $2,812 Not Implemented
UD0186 # 03 Y:1986 03 1986 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,369 $26,000 Implemented
AT0032 # 01 Y:1985 01 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,538 $3,544 Implemented
AT0032 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,391 $300 Implemented
AT0032 # 03 Y:1985 03 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $8,375 $3,000 Implemented
AT0032 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,049 $825 Implemented
AT0032 # 05 Y:1985 05 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,312 $465 Implemented
AT0032 # 06 Y:1985 06 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $859 $720 Implemented
AT0032 # 07 Y:1985 07 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $6,603 $2,700 Implemented
AT0032 # 08 Y:1985 08 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $304 $400 Implemented
MA0041 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,442 $2,640 Implemented
MA0041 # 02 Y:1985 02 1985 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,972 $9,826 Implemented
MA0041 # 03 Y:1985 03 1985 AIR CONDITION ONLY SPACE NECESSARY $16,180 $17,180 Not Implemented
MA0041 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $192 $143 Implemented
CO0039 # 01 Y:1985 01 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $23,355 $520 Implemented
CO0039 # 02 Y:1985 02 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,657 $2,400 Not Implemented
CO0039 # 03 Y:1985 03 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,427 $25,000 Implemented
CO0039 # 04 Y:1985 04 1985 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $22,508 $40,000 Implemented
CO0039 # 05 Y:1985 05 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,490 $500 Implemented