IAC Assessment: HO0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: HO0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Hofstra Univ.
Assessment Year 1991
Principal Product PHARMACEUTICAL PRODUCTS
NAICS n/a
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,340
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,916 2,278,136 kWh $0.13
Fuel Oil #2 $53,560 7,960 MMBtu $6.73
TOTAL ENERGY COSTS $340,476
RECOMMENDED SAVINGS* $178,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $178,215
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7123 KEEP LAMPS AND REFLECTORS CLEAN Savings:
$20,537
Cost:
$17,985
$20,537 162,954 - - - - $20,537
162,954
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,403
Cost:
$7,562
$4,403 36,049 - - - - $4,403
36,049
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,591
Cost:
$35,640
$6,591 52,462 - - - - $6,591
52,462
kWh
-
-
MMBtu
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$462
Cost:
$259
$462 3,810 - - - - $462
3,810
kWh
-
-
MMBtu
-
-
$
05: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$144,397
Cost:
-
$136,625 1,377,491 $31,631 3,701 $(-23,859) - $136,625
1,377,491
kWh
$31,631
3,701
MMBtu
$(-23,859)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$138
Cost:
$173
- - $138 21 - - -
-
kWh
$138
21
MMBtu
-
-
$
07: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$1,687
Cost:
$1,400
- - $1,687 251 - - -
-
kWh
$1,687
251
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$178,215
Cost:
$63,019
$168,618 1,632,766 $33,456 3,973 $(-23,859) - $168,618
1,632,766
kWh
$33,456
3,973
MMBtu
$(-23,859)
-
$
TOTAL IMPLEMENTED Savings:
$178,215
Cost:
$63,019
$168,618 1,632,766 $33,456 3,973 $(-23,859) - $168,618
1,632,766
kWh
$33,456
3,973
MMBtu
$(-23,859)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes