IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,484

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0188 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,399 $500 Not Implemented
GT0188 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,619 $1,842 Not Implemented
OK0098 # 01 Y:1983 01 1983 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $985 $100 Implemented
OK0098 # 02 Y:1983 02 1983 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $296,722 $802,436 Not Implemented
OK0098 # 03 Y:1983 03 1983 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,585 $35,277 Implemented
OK0098 # 04 Y:1983 04 1983 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $15,699 $34,357 Not Implemented
KU0076 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,403 $2,308 Not Implemented
KU0076 # 02 Y:1983 02 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,328 $2,555 Implemented
KU0076 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $579 $816 Not Implemented
KU0076 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $498 $200 Implemented
KU0076 # 05 Y:1983 05 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $433 $380 Implemented
TN0143 # 01 Y:1982 01 1982 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $811 $1,275 Not Implemented
TN0143 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $582 $3,700 Not Implemented
TN0143 # 03 Y:1982 03 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $314 $0 Not Implemented
TN0143 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $187 $0 Not Implemented
TN0143 # 05 Y:1982 05 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $1,423 $464 Not Implemented
UD0050 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $396 Not Implemented
UD0050 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,817 $400 Implemented
UD0050 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,054 $2,800 Not Implemented
UD0050 # 04 Y:1982 04 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,051 $5,156 Implemented
UD0050 # 05 Y:1982 05 1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $233 $0 Not Implemented
GT0137 # 01 Y:1982 01 1982 USE RADIANT HEATER FOR SPOT HEATING $1,584 $560 Not Implemented
GT0137 # 02 Y:1982 02 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,900 $2,039 Not Implemented
GT0137 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $330 $304 Implemented
OK0040 # 01 Y:1982 01 1982 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,020 $2,680 Implemented