Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,977
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0665 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $614,791 | $395,505 | n/a |
SD0665 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $203,574 | $5,892 | n/a |
SD0665 # 03 Y:2025 | 03 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $23,739 | $46,406 | n/a |
SD0665 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,983 | $101,750 | n/a |
SD0665 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $2,233 | n/a |
SD0665 # 06 Y:2025 | 06 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $74,386 | $209,425 | n/a |
DL0248 # 01 Y:2025 | 01 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,580 | $0 | n/a |
DL0248 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,209 | $291 | n/a |
DL0248 # 03 Y:2025 | 03 | 2025 | INSULATE BARE EQUIPMENT | $5,964 | $373 | n/a |
DL0248 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,139 | $10,680 | n/a |
DL0248 # 05 Y:2025 | 05 | 2025 | USE OPTIMUM TEMPERATURE | $1,534 | $550 | n/a |
DL0248 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,995 | $4,980 | n/a |
DL0248 # 07 Y:2025 | 07 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $771 | $736 | n/a |
SF0629 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,502 | $0 | n/a |
SF0629 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $942 | $0 | n/a |
SF0629 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,560 | $254 | n/a |
SF0629 # 04 Y:2025 | 04 | 2025 | INSULATE BARE EQUIPMENT | $6,353 | $4,013 | n/a |
SF0629 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,585 | $8,372 | n/a |
SF0629 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,343 | $22,807 | n/a |
SF0629 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $121,562 | $882,352 | n/a |
UL2416 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $20,797 | $16,250 | n/a |
UL2416 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $565 | $273 | n/a |
UL2416 # 03 Y:2024 | 03 | 2024 | INSTALL SPECTRAL REFLECTORS / DELAMP | $276 | $0 | n/a |
UL2416 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $139 | $469 | n/a |
UL2416 # 05 Y:2024 | 05 | 2024 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $4,975 | $8,000 | n/a |