IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
SIC 28 Chemicals And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0008 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $265 $344 Implemented
SJ0008 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $365 $0 Implemented
SD0621 # 02 Y:2021 02 2021 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,887 $10,000 Implemented
SD0621 # 01 Y:2021 01 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,319 $0 Implemented
SD0611 # 06 Y:2021 06 2021 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $45,722 $186,400 Implemented
SD0611 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $203 $387 Implemented
SD0611 # 01 Y:2021 01 2021 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,193 $22,050 Implemented
SD0611 # 07 Y:2021 07 2021 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,308 $6,000 Implemented
SD0593 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,483 $0 Implemented
SF0547 # 08 Y:2019 08 2019 AIR CONDITION ONLY SPACE NECESSARY $17,743 $33,601 Implemented
SF0547 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,962 $360 Implemented
SF0547 # 01 Y:2019 01 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,284 $0 Implemented
SF0547 # 09 Y:2019 09 2019 INSULATE BARE EQUIPMENT $3,114 $6,574 Implemented
SF0547 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,625 $240 Implemented
SF0547 # 06 Y:2019 06 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,127 $1,647 Implemented
SD0572 # 03 Y:2018 03 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,372 $0 Implemented
SD0572 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $970 $1,350 Implemented
SD0572 # 05 Y:2018 05 2018 INSTALL OCCUPANCY SENSORS $349 $378 Implemented
SD0572 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,304 $22,430 Implemented
SD0572 # 01 Y:2018 01 2018 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $75,389 $234,915 Implemented
SD0548 # 04 Y:2017 04 2017 DISCONNECT BALLASTS $4,196 $2,050 Implemented
SD0548 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $2,573 $5,317 Implemented
SD0548 # 02 Y:2017 02 2017 USE PHOTOCELL CONTROLS $4,954 $5,368 Implemented
SD0548 # 07 Y:2017 07 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,113 $1,500 Implemented
SD0548 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,809 $47,543 Implemented