Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
741
matching recommendationsSIC | 28 | Chemicals And Allied Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0678 # 16 Y:2025 | 16 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,980 | $304 | n/a |
WV0678 # 19 Y:2025 | 19 | 2025 | REDUCE VENTILATION AIR | $631 | $2,400 | n/a |
WV0678 # 14 Y:2025 | 14 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,031 | $684 | n/a |
WV0678 # 10 Y:2025 | 10 | 2025 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $4,453 | $20,950 | n/a |
WV0678 # 13 Y:2025 | 13 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $3,130 | $2,676 | n/a |
WV0678 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,842 | $11,112 | n/a |
WV0678 # 18 Y:2025 | 18 | 2025 | INSULATE BARE EQUIPMENT | $664 | $914 | n/a |
WV0678 # 12 Y:2025 | 12 | 2025 | DEVELOP A REPAIR/REPLACE POLICY | $4,059 | $1,304 | n/a |
WV0678 # 02 Y:2025 | 02 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $22,738 | $38,304 | n/a |
WV0678 # 03 Y:2025 | 03 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,707 | $41,750 | n/a |
WV0678 # 17 Y:2025 | 17 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,209 | $3,002 | n/a |
WV0678 # 05 Y:2025 | 05 | 2025 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $11,667 | $55,000 | n/a |
WV0678 # 11 Y:2025 | 11 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,279 | $18,380 | n/a |
WV0678 # 15 Y:2025 | 15 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,433 | $11,061 | n/a |
WV0678 # 01 Y:2025 | 01 | 2025 | MINIMIZE WATER USAGE | $16,085 | $31,231 | n/a |
WV0678 # 07 Y:2025 | 07 | 2025 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,003 | $3,121 | n/a |
WV0678 # 09 Y:2025 | 09 | 2025 | INSTALL OCCUPANCY SENSORS | $4,772 | $4,323 | n/a |
WV0678 # 06 Y:2025 | 06 | 2025 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $5,185 | $11,425 | n/a |
WV0678 # 04 Y:2025 | 04 | 2025 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,735 | $5,200 | n/a |
UD1096 # 03 Y:2024 | 03 | 2024 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,522 | $1,061 | n/a |
UD1096 # 01 Y:2024 | 01 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,966 | $0 | n/a |
UD1096 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $780 | $872 | n/a |
UD1096 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $24,210 | $242,106 | n/a |
UD1096 # 02 Y:2024 | 02 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $407 | $0 | n/a |
UD1096 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,767 | $6,096 | n/a |