Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,092
matching recommendationsSIC | 281 | Industrial Inorganic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0258 # 03 Y:2024 | 03 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,600 | $54,500 | n/a |
UU0258 # 04 Y:2024 | 04 | 2024 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,690,000 | $23,500,000 | n/a |
UU0258 # 01 Y:2024 | 01 | 2024 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $158,000 | $725,000 | n/a |
UU0258 # 07 Y:2024 | 07 | 2024 | OPTIMIZE PLANT POWER FACTOR | $120,000 | $198,000 | n/a |
UU0258 # 06 Y:2024 | 06 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,570 | $5,140 | n/a |
UU0258 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,800 | $6,200 | n/a |
UU0258 # 08 Y:2024 | 08 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $180,000 | $20,000 | n/a |
UU0258 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,890 | $11,500 | n/a |
WV0669 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $13,442 | $5,225 | n/a |
WV0669 # 01 Y:2024 | 01 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $19,270 | $9,950 | n/a |
WV0669 # 05 Y:2024 | 05 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $6,542 | $14,640 | n/a |
WV0669 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,194 | $16,795 | n/a |
WV0669 # 08 Y:2024 | 08 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,886 | $1,088 | n/a |
WV0669 # 12 Y:2024 | 12 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $1,463 | $1,143 | n/a |
WV0669 # 13 Y:2024 | 13 | 2024 | OPTIMIZE PLANT POWER FACTOR | $1,227 | $5,535 | n/a |
WV0669 # 10 Y:2024 | 10 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $2,422 | $7,600 | n/a |
WV0669 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $6,200 | $11,000 | n/a |
WV0669 # 11 Y:2024 | 11 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,467 | $940 | n/a |
WV0669 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,884 | $35,717 | n/a |
WV0669 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,909 | $6,900 | n/a |
WV0669 # 17 Y:2024 | 17 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $135 | $363 | n/a |
WV0669 # 15 Y:2024 | 15 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $397 | $1,920 | n/a |
WV0669 # 14 Y:2024 | 14 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $843 | $1,200 | n/a |
WV0669 # 16 Y:2024 | 16 | 2024 | INSULATE BARE EQUIPMENT | $357 | $798 | n/a |
WV0669 # 09 Y:2024 | 09 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $3,954 | $10,900 | n/a |