Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,058
matching recommendationsSIC | 281 | Industrial Inorganic Chemicals |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS2406 # 03 Y:2024 | 03 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $9,410 | $28,500 | n/a |
LS2406 # 04 Y:2024 | 04 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,460 | $11,500 | n/a |
LS2406 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,468 | $750 | n/a |
LS2406 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,003 | $50 | n/a |
KS2321 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $1,362 | $3,175 | n/a |
KS2321 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $29,979 | $30 | n/a |
KS2321 # 07 Y:2023 | 07 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,241 | $1,770 | n/a |
KS2321 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,032 | $5,480 | n/a |
KS2321 # 06 Y:2023 | 06 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $125,249 | $627,000 | n/a |
KS2321 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $646 | $1,328 | n/a |
KS2321 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,194 | $18,538 | n/a |
KS2321 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $89,035 | $701,322 | n/a |
UC2307 # 01 Y:2023 | 01 | 2023 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,379 | $0 | Not Implemented |
UC2307 # 08 Y:2023 | 08 | 2023 | METER WASTE WATER | $383 | $455 | Not Implemented |
UC2307 # 10 Y:2023 | 10 | 2023 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,667 | $13,200 | Not Implemented |
UC2307 # 09 Y:2023 | 09 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,108 | $31,637 | Not Implemented |
UC2307 # 03 Y:2023 | 03 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $352 | $0 | Not Implemented |
UC2307 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $6,269 | $41,061 | Not Implemented |
UC2307 # 07 Y:2023 | 07 | 2023 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $3,643 | $34,992 | Not Implemented |
UC2307 # 05 Y:2023 | 05 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $508 | $529 | Not Implemented |
UC2307 # 02 Y:2023 | 02 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $4,994 | $0 | Not Implemented |
UC2307 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $411 | $3,486 | Not Implemented |
UL2301 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,141 | $9,184 | Not Implemented |
UL2301 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $33,531 | $260,163 | Not Implemented |
UL2301 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,408 | $2,832 | Implemented |