Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 282 | Plastics Materials And Synthetics |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NV0063 # 11 Y:1996 | 11 | 1996 | MODIFY MATERIAL APPLICATION METHODS | $28,063 | $2,040 | Implemented |
NV0063 # 10 Y:1996 | 10 | 1996 | MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS | $360 | $600 | Not Implemented |
NV0063 # 09 Y:1996 | 09 | 1996 | USE OPTIMUM THICKNESS INSULATION | $4,848 | $6,210 | Implemented |
NV0063 # 08 Y:1996 | 08 | 1996 | USE OPTIMUM THICKNESS INSULATION | $9,970 | $2,000 | Implemented |
NV0063 # 07 Y:1996 | 07 | 1996 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,535 | $5,200 | Implemented |
NV0063 # 06 Y:1996 | 06 | 1996 | INSULATE BARE EQUIPMENT | $2,375 | $1,452 | Implemented |
NV0063 # 05 Y:1996 | 05 | 1996 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $228 | $180 | Not Implemented |
NV0063 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $100 | $57 | Implemented |
NV0063 # 03 Y:1996 | 03 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,184 | $90 | Implemented |
NV0063 # 02 Y:1996 | 02 | 1996 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $404 | $900 | Not Implemented |
NV0063 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $200 | Implemented |
HO0135 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,710 | $1,680 | Implemented |
HO0135 # 07 Y:1996 | 07 | 1996 | CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES | $78,600 | $50,000 | Implemented |
HO0135 # 06 Y:1996 | 06 | 1996 | RECOVER AND REUSE COOLING WATER | $13,438 | $2,000 | Not Implemented |
HO0135 # 05 Y:1996 | 05 | 1996 | REDUCE SCRAP PRODUCTION | $18,269 | $1,000 | Implemented |
HO0135 # 04 Y:1996 | 04 | 1996 | COMBINE UTILITY METERS | $4,532 | $3,000 | Not Implemented |
HO0135 # 03 Y:1996 | 03 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $950 | $400 | Implemented |
HO0135 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,036 | $12,396 | Not Implemented |
MO0167 # 06 Y:1996 | 06 | 1996 | USE SYNTHETIC LUBRICANT | $599 | $69 | Implemented |
MO0167 # 07 Y:1996 | 07 | 1996 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $411 | $60 | Implemented |
MO0167 # 08 Y:1996 | 08 | 1996 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $2,021 | $9,925 | Implemented |
MO0167 # 05 Y:1996 | 05 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,504 | $60 | Not Implemented |
MO0167 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $810 | $65 | Implemented |
MO0167 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $265 | $0 | Implemented |
MO0167 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,040 | $5,272 | Not Implemented |