IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 282 Plastics Materials And Synthetics
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0151 # 09 Y:1998 09 1998 $187,200 $36,000 Implemented
SF0151 # 08 Y:1998 08 1998 TREAT AND REUSE RINSE WATERS $1,220 $4,835 Implemented
SF0151 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,404 $19,349 Not Implemented
SF0151 # 06 Y:1998 06 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,572 $8,872 Not Implemented
SF0151 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,820 $15,700 Implemented
SF0151 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $1,694 $5,068 Implemented
SF0151 # 10 Y:1998 10 1998 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,120 $6,210 Not Implemented
SF0151 # 03 Y:1998 03 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,792 $5,123 Implemented
SF0151 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,120 $3,259 Implemented
SF0151 # 01 Y:1998 01 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $45,578 $21,000 Implemented
ND0315 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,840 $2,500 Not Implemented
ND0315 # 09 Y:1998 09 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $23,245 $500 Implemented
ND0315 # 08 Y:1998 08 1998 INSTALL OCCUPANCY SENSORS $1,206 $600 Not Implemented
ND0315 # 07 Y:1998 07 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,283 $38,500 Not Implemented
ND0315 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $431 $600 Not Implemented
ND0315 # 04 Y:1998 04 1998 DIRECT WARMEST AIR TO COMBUSTION INTAKE $8,316 $3,500 Not Implemented
ND0315 # 03 Y:1998 03 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,863 $1,000 Implemented
ND0315 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $897 $840 Implemented
ND0315 # 01 Y:1998 01 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,005 $550 Not Implemented
UD0550 # 03 Y:1998 03 1998 $26,700 $40,000 Implemented
UD0550 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $135,950 $139,962 Not Implemented
UD0550 # 02 Y:1998 02 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,061 $1,031 Implemented
IA0193 # 06 Y:1998 06 1998 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $63,788 $9,315 Implemented
IA0193 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $587 $1,110 Not Implemented
IA0193 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $3,418 $399 Not Implemented