IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0223 # 09 Y:2012 09 2012 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,345 $80 Not Implemented
MI0223 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,364 $5,920 Not Implemented
MI0223 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,438 $1,660 Not Implemented
MI0223 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,824 $4,510 Implemented
MI0223 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,047 $1,660 Implemented
MI0223 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,207 $2,520 Implemented
MI0223 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,776 $14,480 Not Implemented
UF0350 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,068 $1,610 Implemented
UF0350 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $563 $1,750 Not Implemented
UF0350 # 07 Y:2004 07 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,988 $0 Not Implemented
UF0350 # 08 Y:2004 08 2004 RECYCLE FLUORESCENT LAMPS $1,968 $3,496 Not Implemented
UF0350 # 09 Y:2004 09 2004 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $4,200 $0 Not Implemented
UF0350 # 10 Y:2004 10 2004 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,795 $3,000 Implemented
UF0350 # 04 Y:2004 04 2004 INSTALL SKYLIGHTS $12,961 $9,706 Implemented
UF0350 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $17,652 $1,339 Not Implemented
UF0350 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,654 $10,151 Implemented
UF0350 # 01 Y:2004 01 2004 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY $22,657 $60,000 Not Implemented
UF0326 # 03 Y:2003 03 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,007 $3,682 Not Implemented
UF0326 # 01 Y:2003 01 2003 DIRECT WARMEST AIR TO COMBUSTION INTAKE $136,220 $60,000 Not Implemented
UF0326 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,941 $1,860 Not Implemented
UF0326 # 04 Y:2003 04 2003 INSTALL STEAM TRAP $5,631 $238 Implemented
UF0326 # 07 Y:2003 07 2003 INSTALL AUTOMATIC PACKING EQUIPMENT $48,872 $32,000 Not Implemented
UF0326 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,783 $0 Implemented
UF0326 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $13,967 $8,000 Not Implemented
UF0306 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,153 $5,064 Implemented