IAC logo
IAC Assessment: UF0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2004
Principal Product Manufacture Fibres
NAICS 325211 - Plastics Material and Resin Manufacturing
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 490,000
Annual Production 12,000,000 Pounds
Production Hrs. Annual 4,368
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $770,725 18,228,204 kWh $0.04
TOTAL ENERGY COSTS $770,725
RECOMMENDED SAVINGS* $82,506 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,478
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes
$ kWh $ lb $ lb $ $
01: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$22,657
Cost:
$60,000
$22,657 539,448 - - - - - - $22,657
539,448
kWh
-
-
lb
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,654
Cost:
$10,151
$6,654 158,422 - - - - - - $6,654
158,422
kWh
-
-
lb
-
-
lb
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$17,652
Cost:
$1,339
$17,652 420,292 - - - - - - $17,652
420,292
kWh
-
-
lb
-
-
lb
-
-
$
04: 2.7145 INSTALL SKYLIGHTS Savings:
$12,961
Cost:
$9,706
$12,961 308,599 - - - - - - $12,961
308,599
kWh
-
-
lb
-
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,068
Cost:
$1,610
$5,068 120,675 - - - - - - $5,068
120,675
kWh
-
-
lb
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$563
Cost:
$1,750
$563 13,403 - - - - - - $563
13,403
kWh
-
-
lb
-
-
lb
-
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,988
Cost:
-
$8,988 213,991 - - - - - - $8,988
213,991
kWh
-
-
lb
-
-
lb
-
-
$
08: 3.5318 RECYCLE FLUORESCENT LAMPS Savings:
$1,968
Cost:
$3,496
- - - - $1,968 - - - -
-
kWh
-
-
lb
$1,968
-
lb
-
-
$
09: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$4,200
Cost:
-
- - $4,200 - - - - - -
-
kWh
$4,200
-
lb
-
-
lb
-
-
$
10: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,795
Cost:
$3,000
- - - - - - $1,795 - -
-
kWh
-
-
lb
-
-
lb
$1,795
-
$
TOTAL RECOMMENDED Savings:
$82,506
Cost:
$91,052
$74,543 1,774,830 $4,200 - $1,968 - $1,795 - $74,543
1,774,830
kWh
$4,200
-
lb
$1,968
-
lb
$1,795
-
$
TOTAL IMPLEMENTED Savings:
$26,478
Cost:
$24,467
$24,683 587,696 - - - - $1,795 - $24,683
587,696
kWh
-
-
lb
-
-
lb
$1,795
-
$
Savings
Cost
$ kWh $ lb $ lb $ $
Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Solid Waste (haz) Administrative Changes