IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

43

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2316 # 11 Y:2023 11 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $52,146 $422,182 Not Implemented
KS2316 # 01 Y:2023 01 2023 REPAIR AND ELIMINATE STEAM LEAKS $11,534 $2,766 Implemented
KS2316 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $1,197 $1,784 Not Implemented
KS2316 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,228 $2,463 Not Implemented
KS2316 # 04 Y:2023 04 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,417 $0 Not Implemented
KS2316 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $125,127 $627,000 Not Implemented
KS2316 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,198 $29,442 Not Implemented
KS2316 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $7,751 $6,350 Not Implemented
KS2316 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,336 $29,920 Implemented
KS2316 # 09 Y:2023 09 2023 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $49,691 $246,356 Implemented
KS2316 # 10 Y:2023 10 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $17,892 $156,412 Implemented
GT0959 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $37,630 $621,000 Not Implemented
GT0959 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,169 $23,000 Not Implemented
GT0959 # 04 Y:2021 04 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $170 $315 Implemented
GT0959 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,641 $1,850 Implemented
GT0959 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $184 $50 Implemented
GT0959 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,495 $800 Implemented
GT0946 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $3,914 $1,050 Implemented
GT0946 # 07 Y:2020 07 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $63,153 $568,008 Not Implemented
GT0946 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $570 $1,430 Not Implemented
GT0946 # 05 Y:2020 05 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,055 $9,579 Not Implemented
GT0946 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,289 $12,280 Implemented
GT0946 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $16,405 $3,377 Implemented
GT0946 # 01 Y:2020 01 2020 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,870 $250 Implemented
GT0897 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,875 $15,743 Implemented