Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Kennesaw State |
---|---|
Assessment Year | 2023 |
Principal Product | Polymers and Powder Resins |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $100,000,000-$500,000,000 |
# of Employees | 49 |
Plant Area (Sq.Ft.) | 160,000 |
Annual Production | 60,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | GA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $934,767 | 10,800,684 | kWh | $0.09 |
Natural Gas | $685,391 | 197,320 | MMBtu | $3.47 |
TOTAL ENERGY COSTS | $1,644,828 | |||
RECOMMENDED SAVINGS* | $291,517 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $91,453 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $11,534 Cost: $2,766 |
- | - | $11,534 | 3,324 | - | - |
- - kWh |
$11,534 3,324 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,197 Cost: $1,784 |
- | - | $1,197 | 345 | - | - |
- - kWh |
$1,197 345 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES |
Savings: $1,228 Cost: $2,463 |
- | - | $1,228 | 354 | - | - |
- - kWh |
$1,228 354 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,417 Cost: - |
- | - | $4,167 | 1,201 | $(-750) | - |
- - kWh |
$4,167 1,201 MMBtu |
$(-750) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $125,127 Cost: $627,000 |
$146,160 | 1,680,000 | $(-14,633) | (-4,217) | $(-6,400) | - |
$146,160 1,680,000 kWh |
$(-14,633) (-4,217) MMBtu |
$(-6,400) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,198 Cost: $29,442 |
$6,051 | 69,552 | - | - | $3,147 | - |
$6,051 69,552 kWh |
- - MMBtu |
$3,147 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $7,751 Cost: $6,350 |
$6,468 | 74,340 | - | - | $1,283 | - |
$6,468 74,340 kWh |
- - MMBtu |
$1,283 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $12,336 Cost: $29,920 |
$12,336 | 141,788 | - | - | - | - |
$12,336 141,788 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $49,691 Cost: $246,356 |
$49,691 | 571,158 | - | - | - | - |
$49,691 571,158 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $17,892 Cost: $156,412 |
$17,892 | 205,651 | - | - | - | - |
$17,892 205,651 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $52,146 Cost: $422,182 |
$52,146 | 599,374 | - | - | - | - |
$52,146 599,374 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $291,517 Cost: $1,524,675 |
$290,744 | 3,341,863 | $3,493 | 1,007 | $(-2,720) | - | $290,744 3,341,863 kWh |
$3,493 1,007 MMBtu |
$(-2,720) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $91,453 Cost: $435,454 |
$79,919 | 918,597 | $11,534 | 3,324 | - | - | $79,919 918,597 kWh |
$11,534 3,324 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |