Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 2821 | Plastics Materials And Resins |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0326 # 07 Y:2003 | 07 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $48,872 | $32,000 | Not Implemented |
UF0326 # 06 Y:2003 | 06 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,783 | $0 | Implemented |
UF0326 # 05 Y:2003 | 05 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $13,967 | $8,000 | Not Implemented |
UF0326 # 04 Y:2003 | 04 | 2003 | INSTALL STEAM TRAP | $5,631 | $238 | Implemented |
UF0326 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $3,682 | Not Implemented |
UF0326 # 01 Y:2003 | 01 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $136,220 | $60,000 | Not Implemented |
UF0326 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,941 | $1,860 | Not Implemented |
LL0158 # 02 Y:2003 | 02 | 2003 | USE PHOTOCELL CONTROLS | $16,687 | $2,262 | Not Implemented |
LL0158 # 06 Y:2003 | 06 | 2003 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $5,000 | $420 | Implemented |
LL0158 # 05 Y:2003 | 05 | 2003 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $116 | $226 | Implemented |
LL0158 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $1,303 | $164 | Implemented |
LL0158 # 03 Y:2003 | 03 | 2003 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $16,068 | $5,800 | Implemented |
LL0158 # 01 Y:2003 | 01 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,145 | $11,600 | Implemented |
WV0255 # 01 Y:2003 | 01 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,219 | $310 | Not Implemented |
WV0255 # 02 Y:2003 | 02 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,774 | $100 | Implemented |
WV0255 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $965 | $2,700 | Not Implemented |
WV0255 # 04 Y:2003 | 04 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,019 | $200 | Not Implemented |
WV0255 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,236 | $2,025 | Implemented |
WV0255 # 06 Y:2003 | 06 | 2003 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $42,452 | $2,000 | Implemented |
WV0255 # 07 Y:2003 | 07 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $27,449 | $2,455 | Not Implemented |
WV0255 # 08 Y:2003 | 08 | 2003 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,094 | $1,000 | Implemented |
WV0255 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,875 | $0 | Implemented |
WV0255 # 10 Y:2003 | 10 | 2003 | REDUCE EXCESS STEAM BLEEDING | $4,622 | $80,000 | Not Implemented |