Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | West Virginia University |
---|---|
Assessment Year | 2003 |
Principal Product | Polystyrene plastic pellets |
NAICS | 325211 - Plastics Material and Resin Manufacturing |
SIC | 2821 - Plastics Materials And Resins |
Sales | $50,000,000-$100,000,000 |
# of Employees | 70 |
Plant Area (Sq.Ft.) | 820,000 |
Annual Production | 400,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $478,058 | 30,066,506 | kWh | $0.02 |
Electricity Demand | $530,587 | 49,705 | kW-months/year | $10.67 |
Natural Gas | $548,258 | 112,800 | MMBtu | $4.86 |
TOTAL ENERGY COSTS | $1,591,385 | |||
RECOMMENDED SAVINGS* | $415,587 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $63,431 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,219 Cost: $310 |
$760 | 37,036 | $459 | 4 | - | - | - | - | - | - | - | - |
$760 37,036 kWh |
$459 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,774 Cost: $100 |
$1,122 | 54,528 | $652 | 6 | - | - | - | - | - | - | - | - |
$1,122 54,528 kWh |
$652 6 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING |
Savings: $965 Cost: $2,700 |
$742 | 36,039 | $223 | 4 | - | - | - | - | - | - | - | - |
$742 36,039 kWh |
$223 4 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2625 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE |
Savings: $2,019 Cost: $200 |
$1,260 | 61,237 | $759 | 7 | - | - | - | - | - | - | - | - |
$1,260 61,237 kWh |
$759 7 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $7,236 Cost: $2,025 |
$4,516 | 219,457 | $2,720 | 25 | - | - | - | - | - | - | - | - |
$4,516 219,457 kWh |
$2,720 25 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $42,452 Cost: $2,000 |
$26,871 | 1,305,608 | $16,181 | 149 | - | - | - | - | $(-600) | - | - | - |
$26,871 1,305,608 kWh |
$16,181 149 kW-months/year |
- - MMBtu |
- - gal |
$(-600) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $27,449 Cost: $2,455 |
- | - | - | - | $27,449 | 5,648 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$27,449 5,648 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $10,094 Cost: $1,000 |
- | - | - | - | $10,094 | 2,077 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,094 2,077 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,875 Cost: - |
$1,170 | 43,169 | $705 | 6 | - | - | - | - | - | - | - | - |
$1,170 43,169 kWh |
$705 6 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2162 REDUCE EXCESS STEAM BLEEDING |
Savings: $4,622 Cost: $80,000 |
$2,884 | 140,160 | $1,738 | 16 | - | - | - | - | - | - | - | - |
$2,884 140,160 kWh |
$1,738 16 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.4151 MINIMIZE WATER USAGE |
Savings: $315,882 Cost: $25,000 |
$1,400 | 67,976 | - | - | - | - | $34,482 | 2,117,000,000 | - | - | $280,000 | - |
$1,400 67,976 kWh |
- - kW-months/year |
- - MMBtu |
$34,482 2,117,000,000 gal |
- - $ |
$280,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $415,587 Cost: $115,790 |
$40,725 | 1,965,210 | $23,437 | 217 | $37,543 | 7,725 | $34,482 | 2,117,000,000 | $(-600) | - | $280,000 | - | $40,725 1,965,210 kWh |
$23,437 217 kW-months/year |
$37,543 7,725 MMBtu |
$34,482 2,117,000,000 gal |
$(-600) - $ |
$280,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $63,431 Cost: $5,125 |
$33,679 | 1,622,762 | $20,258 | 186 | $10,094 | 2,077 | - | - | $(-600) | - | - | - | $33,679 1,622,762 kWh |
$20,258 186 kW-months/year |
$10,094 2,077 MMBtu |
- - gal |
$(-600) - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Primary Raw Material |