IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2821 Plastics Materials And Resins
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0959 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $37,630 $621,000 Not Implemented
GT0959 # 05 Y:2021 05 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,169 $23,000 Not Implemented
GT0959 # 04 Y:2021 04 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $170 $315 Implemented
GT0959 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,641 $1,850 Implemented
GT0959 # 01 Y:2021 01 2021 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $11,495 $800 Implemented
GT0959 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $184 $50 Implemented
TT0258 # 08 Y:2021 08 2021 DEVELOP A REPAIR/REPLACE POLICY $445 $0 Not Implemented
TT0258 # 07 Y:2021 07 2021 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $1,108 $5,000 Not Implemented
TT0258 # 06 Y:2021 06 2021 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $1,703 $7,500 Not Implemented
TT0258 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,092 $10,000 Not Implemented
TT0258 # 04 Y:2021 04 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,652 $4,000 Not Implemented
TT0258 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,751 $37,500 Not Implemented
TT0258 # 02 Y:2021 02 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,627 $25,000 Not Implemented
TT0258 # 01 Y:2021 01 2021 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $65,709 $230,400 Not Implemented
BS0148 # 04 Y:2021 04 2021 INSTALL OCCUPANCY SENSORS $1,298 $600 Not Implemented
BS0148 # 03 Y:2021 03 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $445 $649 Not Implemented
BS0148 # 02 Y:2021 02 2021 RECOVER WASTE HEAT FROM EQUIPMENT $11,112 $50,404 Not Implemented
BS0148 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $39,220 $24,000 Not Implemented
CL2108 # 08 Y:2021 08 2021 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $166 $0 n/a
CL2108 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $947 $0 n/a
CL2108 # 06 Y:2021 06 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,453 $0 n/a
CL2108 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,000 n/a
CL2108 # 04 Y:2021 04 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $182 $520 n/a
CL2108 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,596 $2,100 n/a
CL2108 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $1,049 $3,565 n/a