Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,641
matching recommendationsSIC | 283 | Drugs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0665 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $614,791 | $395,505 | n/a |
SD0665 # 06 Y:2025 | 06 | 2025 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $74,386 | $209,425 | n/a |
SD0665 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $203,574 | $5,892 | n/a |
SD0665 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,342 | $2,233 | n/a |
SD0665 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $58,983 | $101,750 | n/a |
SD0665 # 03 Y:2025 | 03 | 2025 | ADOPT IN-HOUSE MATERIAL GENERATION | $23,739 | $46,406 | n/a |
SF0628 # 03 Y:2025 | 03 | 2025 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $1,061 | $6,460 | n/a |
SF0628 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,482 | $770 | n/a |
SF0628 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $72,544 | $0 | n/a |
SF0623 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,887 | $1,146 | n/a |
SF0623 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,720 | $4,257 | n/a |
SF0623 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,599 | $3,962 | n/a |
SF0623 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,288 | $0 | n/a |
SF0623 # 02 Y:2024 | 02 | 2024 | REDUCE VENTILATION AIR | $4,851 | $0 | n/a |
UU0255 # 07 Y:2024 | 07 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,849 | $4,680 | n/a |
UU0255 # 08 Y:2024 | 08 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,932 | $60,862 | n/a |
UU0255 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,750 | $4,964 | n/a |
UU0255 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,033 | $8,000 | n/a |
UU0255 # 04 Y:2024 | 04 | 2024 | USE OPTIMUM THICKNESS INSULATION | $10,948 | $4,085 | n/a |
UU0255 # 01 Y:2024 | 01 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $64,548 | $8,000 | n/a |
UU0255 # 02 Y:2024 | 02 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $5,674 | $8,711 | n/a |
UU0255 # 03 Y:2024 | 03 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,299 | $2,614 | n/a |
MI0445 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $3,269 | $2,860 | n/a |
MI0445 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,584 | $150 | n/a |
MI0445 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,583 | $5,793 | n/a |