IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,627

matching recommendations
Reset
SIC 283 Drugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0190 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,684 $1,000 Not Implemented
OK0617 # 01 Y:2001 01 2001 INSTALL OCCUPANCY SENSORS $335 $304 Implemented
OK0617 # 02 Y:2001 02 2001 INSTALL SET-BACK TIMERS $323 $439 Implemented
OK0617 # 03 Y:2001 03 2001 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $17,946 $30,145 Not Implemented
OK0617 # 04 Y:2001 04 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $409 $354 Not Implemented
OK0617 # 05 Y:2001 05 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,337 $9,259 Not Implemented
OK0617 # 06 Y:2001 06 2001 $1,170 $1,000 Not Implemented
OK0617 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $23,985 $27,632 Not Implemented
OR0389 # 01 Y:2001 01 2001 $289,800 $26,680 Implemented
OR0389 # 02 Y:2001 02 2001 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $29,980 $20,000 Implemented
OR0389 # 03 Y:2001 03 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,790 $4,721 Implemented
OR0389 # 04 Y:2001 04 2001 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,384 $3,000 Implemented
OR0389 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,103 $590 Implemented
SF0209 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $212 $0 Not Implemented
SF0209 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $1,820 $1,680 Not Implemented
SF0209 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,837 $2,354 Not Implemented
SF0209 # 04 Y:2001 04 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,930 $18,128 Not Implemented
SF0209 # 05 Y:2001 05 2001 INSTALL SPECTRAL REFLECTORS / DELAMP $1,184 $4,100 Not Implemented
SF0209 # 06 Y:2001 06 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $1,508 Not Implemented
SF0209 # 07 Y:2001 07 2001 REUSE / RECYCLE/ SELL PAPER PRODUCTS $165 $36 Not Implemented
SF0209 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $3,276 $110 Not Implemented
MA0477 # 01 Y:2000 01 2000 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $22,890 $2,000 Not Implemented
MA0477 # 02 Y:2000 02 2000 RECOVER WASTE HEAT FROM EQUIPMENT $21,290 $103,000 Not Implemented
MA0477 # 03 Y:2000 03 2000 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,580 $21,000 Not Implemented
MA0477 # 04 Y:2000 04 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,910 $0 Not Implemented